Files
aji/docs
dev eca30f817a Phase 6A: .aji layers 3-4 (addressable values, lexical borrows, slices)
Owner rules: addressability is decided by lowering (a variable that is
borrowed, indexed or written through a place gets frame storage in the
entry block; otherwise SSA; by name, deterministic); borrows are bound
only by 'ref r = place;' / 'mut r = place;' and live to the end of the
block (borrow.end at every normal exit, including break/continue/return);
no shadowing of an active borrow in the same scope; ref/mut as call
arguments are temporaries ended after the call; *r only for scalar and
struct referents, slices via s[i], s[a..b], s.len; writes *r = v,
r.f = v, s[i] = v with the value evaluated first; split_at as the only
multi-result binding; slice.copy(mut dst, ref src) as the only copy;
[e; N] evaluates e once; byte strings as [u8; N] in frame storage with
a fixed escape set; borrow.index.proven only for the verifier's own
fact form (if i < s.len, same SSA values), otherwise checked.

Diagnostics on lowered AIR are deduplicated per code and source
location. aji lower --stats counts code only (no comment lines).

Tests: 10 run (architecture goldens: value-only has no local.alloc,
borrowed has local.alloc, proven indexing), 6 rejects incl.
verifier-caught E2101 (aliasing; parent used after split_at).
Expansion on these programs: 4-9x bytes, 2.2-6.6x lines.
2026-10-05 11:51:04 +03:00
..

Documentation

Layout

Directory Kind Purpose
spec/ Normative What a conforming implementation MUST do
rfcs/ Decision records Major design proposals and their rationale; accepted changes live in spec/
reference/ Normative registries Grammar, error codes, intrinsics, type properties, litmus tests, glossary
design/ Non-normative Short design decisions and the open-questions log
plan/ Non-normative Implementation plan, per-phase task breakdowns, conformance plan
evaluation/ Non-normative Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules
dev/ Non-normative How the reference implementation is built and tested

Precedence

The specification is the single normative source. When documents disagree (from AGENTS.md):

  1. spec/;
  2. reference/;
  3. examples;
  4. README prose.

RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.

design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.

Where to put a new document

You are writing… Put it in
a MUST/SHOULD rule the matching spec/NN-*.md
a major change to memory, concurrency, effects, AIR or unsafe rfcs/NNNN-title.md from rfcs/0000-template.md
a new error code, intrinsic or grammar rule reference/ (and src/diag.zig for codes)
a new AIR feature bundle reference/air-features.md (and src/air/features.zig)
a small decision with a one-paragraph reason design/decisions.md as the next DD-NNN
a gap or ambiguity you found but cannot resolve now design/open-questions.md as the next Q-NNN
tasks, milestones, sequencing plan/
benchmark tasks, evaluation methodology (public dev material only) evaluation/; hidden tests go to the private benchmark repository
implementation architecture, conventions, test how-to dev/

Reading order

New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.

Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.