18 runs, 17 accepted; frontier agents at ceiling; GLM Aji/AIR 1/2 (BUDGET). No compression signal; Aji/AIR costs more for every agent. Plan and protocol updated (budget-terminated runs are judged on their final repository). ajieval profile: per-run termination, output tokens, source size and diagnostic-code occurrences, without task content.
Evaluation
Non-normative. Empirical validation of the Aji hypothesis stated in spec 14: that the language, verifier and runtime take over enough reasoning for weaker models to write correct systems software at lower cost (Model Capability Compression).
| Document | Purpose |
|---|---|
| benchmark-authoring.md | Separation of roles for E0-2 and E-G: benchmark author and reference writers in clean contexts; brief; gate checklist |
| harness.md | Agent scaffold and run recorder (E0-3): task format, evaluator contract, run record, commands |
| protocol.md | Agent Language Evaluation Protocol 0.2: variables, benchmark families T01–T10, conditions Aji/AIR and Aji/source, maintenance and seeded-bug benchmarks, metrics, statistics, stages A–E, success and falsification criteria |
| ../agent/README.md | Agent Reference Bundle: contents, measurement, growth policy, milestones |
Integrity rules (protocol §7, §29; spec 14 §12)
- This public repository contains only the protocol and dev material. Hidden tests, evaluators and reference implementations of the validation and test sets live in a separate private benchmark repository.
- Agents used to develop the language (including the agent working in this repository) MUST NOT see the held-out corpus.
- Language features MUST NOT be introduced to improve a specific benchmark task; benchmark failures are classified first (protocol §38).
- Negative results are kept and reported (protocol §37).
Stages and language milestones
| Stage | Tasks | Requires | Status |
|---|---|---|---|
| A — Phase 2 validation | T01–T04 | Phase 2 (heap, regions, resources, capabilities, effects, deterministic I/O) | language ready; harness done (E0-3); tasks and baselines pending (E0-2, E0-4) |
| B — Phase 3 validation | T05–T07 | Phase 3 (structured concurrency, schedule exploration) | language ready; infrastructure: harness done (E0-3), tasks pending (E0-2) |
| C — Atomic validation | T08, litmus repair | Phase 5 (atomics, memory model) | blocked on Phase 5 |
| D — Systems integration | T09, T10 | Phases 3–5; stable features | blocked |
| E — Maintenance campaign | M1–M8 on T03, T07, T09, T10 | D | blocked |
Until the source language (Phase 6) exists, Aji runs use the condition Aji/AIR: the agent writes text AIR directly. This is a deliberate experiment, not a stopgap: if AIR alone helps weaker models, that is strong evidence, and after Phase 6 Aji/source is compared against Aji/AIR.
Order (protocol §30a): bundle baseline (done) → Phase 3 → second bundle measurement → private benchmark repository (in parallel) → harness → 36-run smoke test (§39a) → 108-run Stage A pilot.