Files
aji/docs
dev c699529fec Phase 4: islands, frozen graphs and arc through every layer (RFC 0014)
AIR: types island<T>, frozen<T>, arc<T>, iref<T>; 16 instructions
(island.create/alloc/root/borrow/freeze/destroy, frozen.root/borrow/
release, arc.from_frozen/new/clone/release/root/borrow, iref.eq); features
islands (depends on heap) and arc (depends on islands) published.
Verifier: IslandSafe/ArcSafe (E2111 at the owner type), container child
borrows (one mut access per island), Send/Share rows (island not Share),
linear owners, mem.alloc effect, element rules (recursion through iref).
Interpreter: graphs with never-reused identities, T0010 for a foreign
iref, O(1) freeze/conversion/transfer, arc counts in a trace hook
(Options.arc_events), budgets per the quota table, collector support.
.aji layer 9: types, operations, island.at/frozen.at/arc.at as borrow
places with explicit container borrows, iref ==/!=.
Frontend fix: joins carry only variables the construct assigns (and that
are read again), so an unchanged linear value is never a block argument
while borrowed.

Tests: 10 AIR (phase4), 6 .aji run + 12 rejects (layer9), the reference
program island-pipeline in .aji, equivalent to an independently
hand-written AIR program (36 on 30 schedule seeds); unit tests for the
arc count trace and O(1) transfer. Quick Reference §7 graphs (checked
excerpt of quickref/graphs.aji); coverage 61/61. Bundle growth: AIR
+7.0%, Quick Reference +0.6k, source docs +4.2k (recorded).
Spec: quota rows match the header-reserved count; idioms and iref
recursion in spec 03 §22; P4-11 (air-text.ebnf gaps) recorded.
2026-10-05 22:14:05 +03:00
..

Documentation

Layout

Directory Kind Purpose
spec/ Normative What a conforming implementation MUST do
rfcs/ Decision records Major design proposals and their rationale; accepted changes live in spec/
reference/ Normative registries Grammar, error codes, intrinsics, type properties, litmus tests, glossary
design/ Non-normative Short design decisions and the open-questions log
plan/ Non-normative Implementation plan, per-phase task breakdowns, conformance plan
evaluation/ Non-normative Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules
dev/ Non-normative How the reference implementation is built and tested

Precedence

The specification is the single normative source. When documents disagree (from AGENTS.md):

  1. spec/;
  2. reference/;
  3. examples;
  4. README prose.

RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.

design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.

Where to put a new document

You are writing… Put it in
a MUST/SHOULD rule the matching spec/NN-*.md
a major change to memory, concurrency, effects, AIR or unsafe rfcs/NNNN-title.md from rfcs/0000-template.md
a new error code, intrinsic or grammar rule reference/ (and src/diag.zig for codes)
a new AIR feature bundle reference/air-features.md (and src/air/features.zig)
a small decision with a one-paragraph reason design/decisions.md as the next DD-NNN
a gap or ambiguity you found but cannot resolve now design/open-questions.md as the next Q-NNN
tasks, milestones, sequencing plan/
benchmark tasks, evaluation methodology (public dev material only) evaluation/; hidden tests go to the private benchmark repository
implementation architecture, conventions, test how-to dev/

Reading order

New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.

Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.