Files
aji/tools
dev c2c238d9b1 M checkpoints recorded; harness statuses; memory test split; P6A-12
- results note docs/evaluation/results/2026-10-06-m-checkpoints.md:
  both checkpoints, owner's assessment (IR-tax closed at the engineering
  level, layer 7 GO; cost hypothesis open); plan status and order
- P6A-12: source type-check completeness (E1001 reached the verifier
  from a source run); not a layer 7 blocker
- harness: metrics.agent_status (max_tokens for a reply cut at its
  length limit, provider_rate_limited for 429/usage limits) and
  metrics.evaluation_status (accepted/rejected/evaluator_error/
  infrastructure_failure/not_evaluated), kept apart; termination records
  max_tokens; checkpoint rows show both; evaluator contract: an
  infrastructure failure sets "infrastructure": true
- interpreter memory test: fast form (20k-320k iterations, 256 KiB
  threshold via Options.collect_threshold) in zig build test; full form
  (100k/1M/4M) in zig build test-extended; CI job 'extended' also runs
  conformance with --collect-every-step
2026-10-05 17:43:55 +03:00
..