Files
aji/docs
dev ba3e9b3719 Phase 6A: .aji frontend, layer 1 (scalars, expressions, functions, control flow)
src/frontend: lexer, AST, parser for the full 6A grammar (first error
only: one E7001 with span, expected and found), lowering to canonical
text AIR with a line map. Variables become SSA with block parameters
carried across if/while/for/loop joins; short-circuit and/or; checked,
wrapping and cast forms; calls; untyped let literals typed from later
uses, never guessed (E7007). The frontend repairs nothing.

check.checkFile: .aji → frontend → existing AIR parser and verifier;
every diagnostic at its source location, AIR location kept as
air_line/air_col; trap records gain source_location. CLI: check/run on
.aji, aji lower [--annotate].

Runner: .aji tests with the same headers; every accepted module must
lower deterministically, be canonical (lower → parse → print
unchanged) and match <file>.expected if present. Layer-1 tests: 6 run,
6 E7xxx rejects, 2 verifier-caught (E1002, E3101).
2026-10-05 11:23:18 +03:00
..

Documentation

Layout

Directory Kind Purpose
spec/ Normative What a conforming implementation MUST do
rfcs/ Decision records Major design proposals and their rationale; accepted changes live in spec/
reference/ Normative registries Grammar, error codes, intrinsics, type properties, litmus tests, glossary
design/ Non-normative Short design decisions and the open-questions log
plan/ Non-normative Implementation plan, per-phase task breakdowns, conformance plan
evaluation/ Non-normative Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules
dev/ Non-normative How the reference implementation is built and tested

Precedence

The specification is the single normative source. When documents disagree (from AGENTS.md):

  1. spec/;
  2. reference/;
  3. examples;
  4. README prose.

RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.

design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.

Where to put a new document

You are writing… Put it in
a MUST/SHOULD rule the matching spec/NN-*.md
a major change to memory, concurrency, effects, AIR or unsafe rfcs/NNNN-title.md from rfcs/0000-template.md
a new error code, intrinsic or grammar rule reference/ (and src/diag.zig for codes)
a new AIR feature bundle reference/air-features.md (and src/air/features.zig)
a small decision with a one-paragraph reason design/decisions.md as the next DD-NNN
a gap or ambiguity you found but cannot resolve now design/open-questions.md as the next Q-NNN
tasks, milestones, sequencing plan/
benchmark tasks, evaluation methodology (public dev material only) evaluation/; hidden tests go to the private benchmark repository
implementation architecture, conventions, test how-to dev/

Reading order

New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.

Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.