Files
aji/docs
dev aaf32b6853 Phase 3: channels, mutex, select and cancellation points (RFC 0012)
- features cancellation, channels, sync supported
- AIR model/parser/printer: shield, sender<T>, receiver<T>, mutex<T>,
  guard<T>; task.check_cancel, task.join.cancel, task.shield.*,
  channel.*, select (bracketed arms), mutex.*
- verifier: arities (E5002), element rules (E4001/E1001, E0006
  channel_transfer), guard_transfer gating, task.wait effect (gated for
  task.join by cancellation), per-edge consumption with values and
  handles returned as block parameters, loans moved to the handle on
  task.join.cancel's cancelled edge, shield order (E4305), guard
  children (E2102), critical-section rule (E4304)
- interpreter: waiting-operation rule (ready, else cancelled if
  observable, else wait), shield depth, bounded and rendezvous channels
  with FIFO offers, drain-then-close receiver, budget release at the
  last close, select with seeded draw among ready arms, mutex wakeups;
  schedule record also after a select draw
- report counts task.spawn, task.wait and channel allocations
- spec erratum: mutex<T> is linear (format 0 has no droppable
  move-only class)
- 30 new conformance tests (10 run with schedules, 4 accept, 16
  reject); 6000-run schedule stress and 4350 mutants without failure
2026-10-04 16:49:37 +03:00
..
2026-10-04 15:03:44 +03:00

Documentation

Layout

Directory Kind Purpose
spec/ Normative What a conforming implementation MUST do
rfcs/ Decision records Major design proposals and their rationale; accepted changes live in spec/
reference/ Normative registries Grammar, error codes, intrinsics, type properties, litmus tests, glossary
design/ Non-normative Short design decisions and the open-questions log
plan/ Non-normative Implementation plan, per-phase task breakdowns, conformance plan
evaluation/ Non-normative Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules
dev/ Non-normative How the reference implementation is built and tested

Precedence

The specification is the single normative source. When documents disagree (from AGENTS.md):

  1. spec/;
  2. reference/;
  3. examples;
  4. README prose.

RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.

design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.

Where to put a new document

You are writing… Put it in
a MUST/SHOULD rule the matching spec/NN-*.md
a major change to memory, concurrency, effects, AIR or unsafe rfcs/NNNN-title.md from rfcs/0000-template.md
a new error code, intrinsic or grammar rule reference/ (and src/diag.zig for codes)
a new AIR feature bundle reference/air-features.md (and src/air/features.zig)
a small decision with a one-paragraph reason design/decisions.md as the next DD-NNN
a gap or ambiguity you found but cannot resolve now design/open-questions.md as the next Q-NNN
tasks, milestones, sequencing plan/
benchmark tasks, evaluation methodology (public dev material only) evaluation/; hidden tests go to the private benchmark repository
implementation architecture, conventions, test how-to dev/

Reading order

New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.

Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.