- features cancellation, channels, sync supported - AIR model/parser/printer: shield, sender<T>, receiver<T>, mutex<T>, guard<T>; task.check_cancel, task.join.cancel, task.shield.*, channel.*, select (bracketed arms), mutex.* - verifier: arities (E5002), element rules (E4001/E1001, E0006 channel_transfer), guard_transfer gating, task.wait effect (gated for task.join by cancellation), per-edge consumption with values and handles returned as block parameters, loans moved to the handle on task.join.cancel's cancelled edge, shield order (E4305), guard children (E2102), critical-section rule (E4304) - interpreter: waiting-operation rule (ready, else cancelled if observable, else wait), shield depth, bounded and rendezvous channels with FIFO offers, drain-then-close receiver, budget release at the last close, select with seeded draw among ready arms, mutex wakeups; schedule record also after a select draw - report counts task.spawn, task.wait and channel allocations - spec erratum: mutex<T> is linear (format 0 has no droppable move-only class) - 30 new conformance tests (10 run with schedules, 4 accept, 16 reject); 6000-run schedule stress and 4350 mutants without failure
Documentation
Layout
| Directory | Kind | Purpose |
|---|---|---|
spec/ |
Normative | What a conforming implementation MUST do |
rfcs/ |
Decision records | Major design proposals and their rationale; accepted changes live in spec/ |
reference/ |
Normative registries | Grammar, error codes, intrinsics, type properties, litmus tests, glossary |
design/ |
Non-normative | Short design decisions and the open-questions log |
plan/ |
Non-normative | Implementation plan, per-phase task breakdowns, conformance plan |
evaluation/ |
Non-normative | Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules |
dev/ |
Non-normative | How the reference implementation is built and tested |
Precedence
The specification is the single normative source. When documents disagree (from AGENTS.md):
spec/;reference/;- examples;
- README prose.
RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.
design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.
Where to put a new document
| You are writing… | Put it in |
|---|---|
| a MUST/SHOULD rule | the matching spec/NN-*.md |
| a major change to memory, concurrency, effects, AIR or unsafe | rfcs/NNNN-title.md from rfcs/0000-template.md |
| a new error code, intrinsic or grammar rule | reference/ (and src/diag.zig for codes) |
| a new AIR feature bundle | reference/air-features.md (and src/air/features.zig) |
| a small decision with a one-paragraph reason | design/decisions.md as the next DD-NNN |
| a gap or ambiguity you found but cannot resolve now | design/open-questions.md as the next Q-NNN |
| tasks, milestones, sequencing | plan/ |
| benchmark tasks, evaluation methodology (public dev material only) | evaluation/; hidden tests go to the private benchmark repository |
| implementation architecture, conventions, test how-to | dev/ |
Reading order
New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.
Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.