Files
aji/docs/plan/phase-3-structured-concurrency.md
T
dev 929132c81d Phase 3: owner decisions on RFC 0012 implementation
- spec 04 §40: mutex<T> always linear, never copyable; mutex.take is the
  only way to dismantle it and needs no live borrow (hence no guard and
  no waiter); no unlock or destructor
- P3-10 (async buffer claims, E4303) moved to P7-10 with task-aware
  I/O; E4303 stays reserved; Phase 3 scope closed
- RFC 0012 erratum: consumption after send is E2002, use is E2001
- tests: take while borrowed (E2101), use after take (E3001)
2026-10-04 16:57:59 +03:00

4.1 KiB
Raw Blame History

Phase 3 — Structured concurrency

Non-normative. Part of the implementation plan.

Goal: tasks that cannot outlive their scopes, ownership transfer through bounded channels, synchronized shared state, cooperative cancellation, and a deterministic scheduler.

Out of scope (owner decision): async I/O and its buffer claims (E4303 stays reserved; P7-10); RwLock, several receivers and atomics (later RFCs). No further features are added to Phase 3.

Exit criterion: parallel_map and channel_transfer examples run under deterministic and randomized schedules.

Spec inputs: spec 04 §1–19, 11 §3, §5–6. RFC 0002 is proposed for acceptance (owner decision); acceptance integrates it into the spec.

Blocking questions: Q-013 deterministic select and seeds, Q-014 Send/Share for capability-holding aggregates. (Q-019 is resolved: fuel, schedule budget and quantum are defined in spec 11 §7.)

Invariants (AGENTS.md change checklist applies to every task here)

  • no child task outlives its scope; no silent detachment;
  • values moved into migratable tasks are Send; concurrently read values are Share;
  • concurrent mutable borrows are proven disjoint;
  • every interpreter run is reproducible from its seed.

Tasks

ID Status Task Depends Output Done when
P3-1 done Resolve Q-013, Q-014 (RFC 0011, RFC 0012) — spec 04, 11 questions resolved
P3-2 done Contract tables: task.* (RFC 0011), channel.*, mutex.*, select, cancellation (RFC 0012, spec 04 §37–§41); rwlock.* deferred (reserved rwlock); thread.* deferred to native backends P3-1 spec 07 appendix all spec 07 §4 fields including synchronization effects
P3-2a done Publish features tasks, cancellation, channels, sync P3-2 reference/air-features.md, src/air/features.zig feature_not_declared / missing_dependency tests
P3-3 done Deterministic scheduler: seeds, choice points, choice log; global fuel across tasks and a separate quantum (spec 11 §7.2) P3-2 src/interp/sched.zig same seed ⇒ identical trace; choice log replays a run; fuel is the sum over all tasks
P3-4 done Send/Share/Local derivation P3-1 src/verifier/send_share.zig E4001, E4002 accept/reject
P3-5 done Task-scope verifier and scoped borrows P3-2 src/verifier/tasks.zig E4301, E4302 accept/reject
P3-6 done Concurrent alias / data-race rejection P3-5 src/verifier/borrow.zig E4101 accept/reject; disjoint split_mut halves accepted in two tasks
P3-7 done Interpreter tasks: spawn, join, cancel, cancellation points, shields, task failure P3-3 src/interp/ cancellation observed only at defined points; shield defers it
P3-8 done Bounded and rendezvous channels with ownership transfer P3-7 interpreter + verifier sender cannot use moved message (E2001); capacity 0 rendezvous test
P3-9 done Mutex with linear guards and the critical-section rule (E4304); RwLock deferred P3-7 interpreter + verifier guard not Send; unlock consumes guard; E3002 on leaked guard
P3-10 moved Async I/O buffer claims: moved to P7-10 (owner decision; needs task-aware I/O) P3-7 verifier + runtime E4303 accept/reject
P3-11 todo Blocking effect and blocking pool policy P3-7 spec 04 §18, runtime thread.block from ordinary task handled per spec
P3-12 doing Runner: seed:/schedules:/quantum: headers (schedule budget kept separate from fuel); stress modes (1/2/N workers, random, forced yield, slow consumer, cancellation during waits, I/O reordering) P3-3 tools/conformance.zig stress modes selectable; failing seed printed for replay
P3-13 todo Reference programs: parallel-map, channel transfer, tcp-echo with tasks P3-8, P3-9 tests/programs/ pass under all stress modes
P3-14 todo Phase exit review all plan status exit criterion passes

Conformance tests to add

Negative corpus entries owned by this phase: non-Send transfer, non-Share concurrent read, task escape. Plus E4101, E4302. Scheduler tests for every synchronization primitive (testing policy in AGENTS.md).