Files
aji/docs/evaluation
dev c2c238d9b1 M checkpoints recorded; harness statuses; memory test split; P6A-12
- results note docs/evaluation/results/2026-10-06-m-checkpoints.md:
  both checkpoints, owner's assessment (IR-tax closed at the engineering
  level, layer 7 GO; cost hypothesis open); plan status and order
- P6A-12: source type-check completeness (E1001 reached the verifier
  from a source run); not a layer 7 blocker
- harness: metrics.agent_status (max_tokens for a reply cut at its
  length limit, provider_rate_limited for 429/usage limits) and
  metrics.evaluation_status (accepted/rejected/evaluator_error/
  infrastructure_failure/not_evaluated), kept apart; termination records
  max_tokens; checkpoint rows show both; evaluator contract: an
  infrastructure failure sets "infrastructure": true
- interpreter memory test: fast form (20k-320k iterations, 256 KiB
  threshold via Options.collect_threshold) in zig build test; full form
  (100k/1M/4M) in zig build test-extended; CI job 'extended' also runs
  conformance with --collect-every-step
2026-10-05 17:43:55 +03:00
..

Evaluation

Non-normative. Empirical validation of the Aji hypothesis stated in spec 14: that the language, verifier and runtime take over enough reasoning for weaker models to write correct systems software at lower cost (Model Capability Compression).

Document Purpose
benchmark-authoring.md Separation of roles for E0-2 and E-G: benchmark author and reference writers in clean contexts; brief; gate checklist
results/ Recorded experiment outcomes (shareable numbers only; private tasks under aliases)
harness.md Agent scaffold and run recorder (E0-3): task format, evaluator contract, run record, commands
protocol.md Agent Language Evaluation Protocol 0.2: variables, benchmark families T01–T10, conditions Aji/AIR and Aji/source, maintenance and seeded-bug benchmarks, metrics, statistics, stages A–E, success and falsification criteria
../agent/README.md Agent Reference Bundle: contents, measurement, growth policy, milestones

Integrity rules (protocol §7, §29; spec 14 §12)

  • This public repository contains only the protocol and dev material. Hidden tests, evaluators and reference implementations of the validation and test sets live in a separate private benchmark repository.
  • Agents used to develop the language (including the agent working in this repository) MUST NOT see the held-out corpus.
  • Language features MUST NOT be introduced to improve a specific benchmark task; benchmark failures are classified first (protocol §38).
  • Negative results are kept and reported (protocol §37).

Stages and language milestones

Stage Tasks Requires Status
A — Phase 2 validation T01–T04 Phase 2 (heap, regions, resources, capabilities, effects, deterministic I/O) language ready; harness done (E0-3); tasks and baselines pending (E0-2, E0-4)
B — Phase 3 validation T05–T07 Phase 3 (structured concurrency, schedule exploration) language ready; infrastructure: harness done (E0-3), tasks pending (E0-2)
C — Atomic validation T08, litmus repair Phase 5 (atomics, memory model) blocked on Phase 5
D — Systems integration T09, T10 Phases 3–5; stable features blocked
E — Maintenance campaign M1–M8 on T03, T07, T09, T10 D blocked

Until the source language (Phase 6) exists, Aji runs use the condition Aji/AIR: the agent writes text AIR directly. This is a deliberate experiment, not a stopgap: if AIR alone helps weaker models, that is strong evidence, and after Phase 6 Aji/source is compared against Aji/AIR.

Order (protocol §30a): bundle baseline (done) → Phase 3 → second bundle measurement → private benchmark repository (in parallel) → harness → 36-run smoke test (§39a) → 108-run Stage A pilot.