- air: cap<K> and built-in enums (cap_error) as types; enum.switch over built-in enums; cap.narrow terminator with ok/err targets; intrinsic syntax (registry still empty: E0004); registries for effects, capability kinds and built-in enums, synced with reference docs - verifier: effect stage (E3101, flat, direct callees); cap.narrow form check (E3202) and ok/err parameter rules (E5002, E1001); capabilities are copyable, not zeroable, not comparable; sizes cap 8, built-in tag - interp: host authority table; @main instantiation from grants by parameter name with not_instantiated reasons; capabilities render as opaque - CLI: --grant P=KIND[:SCOPE], exit code 6; runner: grant: and not_instantiated: headers, pending only for unsupported features - conformance: 18 Phase 2 tests; 4000 mutants without a crash
7.6 KiB
7.6 KiB
Implementation Plan
Non-normative. The order in which the Zig reference implementation is built, and how work is split into tasks. The spec defines what to build; this plan defines when.
Sequencing principles
- Semantics before speed. Interpreter and verifier define the language. No native code until the conformance corpus is stable (DD-007).
- AIR before source. AIR is the conformance format. The
.ajifrontend comes after the core semantics are executable. - Spec gate first in every phase. Each phase opens by resolving its open questions (
../design/open-questions.md) and writing the instruction contracts (spec 07 §4) for the opcodes it introduces. Code that implements unspecified behavior is not merged. - Tests before code. Every verifier rule lands with an
accept/rejectconformance pair and a stable diagnostic code. - Exit criteria are executable. A phase is done when its exit criterion passes in
zig build conformance, not when its tasks are ticked. - One task, one change. A task is sized for one agent session and one reviewable change.
Milestones
| Milestone | Phases | Result |
|---|---|---|
| M1 — Verified core | P0, P1, P2 | Single-threaded Aji: ownership, regions, effects, capabilities and resources verified; file-copy and TCP echo run in the interpreter |
| M2 — Concurrent Aji | P3, P4, P5 | Structured tasks, channels, locks, islands and atomics with deterministic and randomized scheduling |
| M3 — Source language | P6 | All reference programs written as .aji |
| M4 — Native | P7 | LLVM backend; interpreter and native agree on the whole corpus |
| M5 — Agent-ready | P8 | ajid protocol and benchmark; candidate for Aji 0.1 |
Phases
| Phase | File | Goal | Exit criterion | Blocking questions |
|---|---|---|---|---|
| P0 | phase-0-semantic-skeleton.md | AIR model, text parser, CFG/SSA/type verifier, interpreter | AIR hello and arithmetic tests execute identically across runs |
resolved except Q-016 (floats reserved) |
| P1 | phase-1-ownership-and-memory.md | Frame storage, second-class borrows, arrays/slices, init tracking, bounds (RFC 0005) | file-copy core on a local buffer; alias/dangling/escape/uninit/OOB rejected | resolved (Q-009, Q-010) |
| P2 | phase-2-effects-capabilities-resources.md | Effects, capabilities, heap (Own), regions, linear resources, runtime intrinsics |
safe file-copy and basic TCP echo | Q-011, Q-012, Q-018 |
| P3 | phase-3-structured-concurrency.md | Task scopes, Send/Share, channels, mutex, cancellation, deterministic scheduler | parallel-map and channel ownership-transfer examples | Q-013, Q-014 |
| P4 | phase-4-islands.md | Islands, iref, transfer, freeze, Frozen, Arc |
cyclic graph moves between tasks with no deep copy and no shared mutation | — |
| P5 | phase-5-atomics-and-memory-model.md | Atomics, orderings, fences, weak-memory interpreter, schedule exploration, replay | atomic publication litmus/conformance tests | Q-015, Q-017 |
| P6 | phase-6-source-language.md | .aji parser, lowering, generics, contracts, formatter |
all reference programs authored primarily as .aji |
— |
| P7 | phase-7-native-backend.md | LLVM lowering, native runtime, three targets, ABI tests | interpreted and native executions pass the same corpus | — |
| P8 | phase-8-agent-protocol.md | ajid, inspect/trace, verification report, benchmark |
external agent implements/repairs a reference task using only protocol + spec | — |
Dependency graph
P0 ──► P1 ──► P2 ──► P3 ──► P4
│ │
└──────┴──► P5 ──► P6 ──► P7 ──► P8
Allowed overlap:
- spec-gate tasks of a later phase may start any time;
- P6 grammar work (P6-1) may start after P2, since syntax does not affect AIR semantics;
- P8 protocol design (P8-1) may start after P2;
ajidwrapscheck.zig, which exists from P0.
Error code coverage
Every registry code (../reference/error-codes.md) has a phase that must implement it with an accept/reject pair.
| Code | Phase | Code | Phase | |
|---|---|---|---|---|
| E1001 type.mismatch | P0 | E3101 effect.undeclared | P2 | |
| E1002 type.invalid_cast | P0 | E3201 capability.missing | P2 | |
| E1010 init.read_uninitialized | P1 | E3202 capability.widen | P2 | |
| E2001 ownership.use_after_move | P2 | E4001 concurrency.not_send | P3 | |
| E2002 ownership.double_consume | P2 | E4002 concurrency.not_share | P3 | |
| E2101 borrow.mutable_alias | P1 | E4101 concurrency.possible_data_race | P3 | |
| E2102 borrow.outlives_owner | P1 | E4201 atomic.invalid_order | P5 | |
| E2103 memory.out_of_bounds | P1 | E4301 task.live_child_escape | P3 | |
| E2104 memory.region_generation | P2 | E4302 task.borrow_escape | P3 | |
| E2110 island.escape | P4 | E4303 io.buffer_in_flight | P3 | |
| E2111 island.foreign_mutable_edge | P4 | E5001 air.invalid_ssa | P0 | |
| E3001 resource.use_after_consume | P2 | E5002 air.invalid_cfg | P0 | |
| E3002 resource.leak | P2 | E5101 verifier.resource_limit | P0 | |
| E6001 unsafe.required | P2 | E6101 abi.unaligned_reference | P7 | |
| E2105 borrow.not_ended | P1 | E2106 borrow.use_after_end | P1 | |
| E2107 borrow.not_owned | P1 | E2108 borrow.escapes_frame | P1 | |
| E0001–E0006, E1003 | P0 | T0001–T0007 P0, T0008 | P1 |
Cross-cutting tracks
These run through all phases rather than belonging to one.
| Track | Rule |
|---|---|
| Spec | Each phase's first tasks update ../spec/ and the open-questions log. RFCs are proposed for acceptance in the phase that implements them (0001 in P1, 0002 in P3, 0003 in P5; 0004 was accepted after P0); acceptance integrates their rules into the spec in the same change. New constructs extend format 0 only under spec 07 §8.7. |
| Diagnostics | New codes are added to ../reference/error-codes.md and src/diag.zig together; structured fields per code are documented in the spec section that defines the rule. |
| Determinism | Every run test is executed twice and compared from P0-12 on; concurrency tests add schedule stress from P3. |
| Audit reports | Each phase that adds an auditable fact (unsafe sites, effects, capabilities, weak atomics, eliminated checks) extends the report in src/report/ (spec 10 §6, spec 13 §5). |
| Features | Every phase from P1 publishes its feature bundles (../reference/air-features.md) when their semantics are specified, and adds them to supported when implemented. aji features is the discovery interface for agents. |
| Packages | Minimal aji.toml reading for capabilities in P2; dependencies, lockfile and sandboxed build extensions in P8 (spec 12). |
Task conventions
- IDs are
P<phase>-<n>and never reused. A task split later becomesP1-4a,P1-4b. - Status lives in the phase file's task table:
todo,doing,done,dropped. Update it in the same change that completes the task. Done whenis the acceptance test. If it cannot be checked mechanically, rewrite it.- Discovered work goes into the current phase file as a new task, or into
../design/open-questions.mdif it is a spec gap.
Status
| Phase | Status |
|---|---|
| P0 | done; AIR format 0 frozen as the semantic baseline (spec 07 §8.7) |
| P1 | done (exit review in the phase file) |
| P2 | in progress: RFC 0006 (effects, capabilities) accepted and implemented; next RFC 0007 (I/O) and RFC 0008 (heap, regions) |
| P3–P8 | not started |