Owner decision after the native smoke: a minimal .aji frontend over the frozen Phase 0-3 semantics (removes SSA, block parameters, CFG, feature header; keeps every semantically significant action explicit), with quantitative targets; quick reference and generic diagnostics in parallel; new harder held-out benchmark; four conditions Rust, Zig, Aji/AIR, Aji/source. Protocol: seen held-out tasks become dev material.
Implementation Plan
Non-normative. The order in which the Zig reference implementation is built, and how work is split into tasks. The spec defines what to build; this plan defines when.
Sequencing principles
- Semantics before speed. Interpreter and verifier define the language. No native code until the conformance corpus is stable (DD-007).
- AIR before source. AIR is the conformance format. The
.ajifrontend comes after the core semantics are executable. - Spec gate first in every phase. Each phase opens by resolving its open questions (
../design/open-questions.md) and writing the instruction contracts (spec 07 §4) for the opcodes it introduces. Code that implements unspecified behavior is not merged. - Tests before code. Every verifier rule lands with an
accept/rejectconformance pair and a stable diagnostic code. - Exit criteria are executable. A phase is done when its exit criterion passes in
zig build conformance, not when its tasks are ticked. - One task, one change. A task is sized for one agent session and one reviewable change.
Milestones
| Milestone | Phases | Result |
|---|---|---|
| M1 — Verified core | P0, P1, P2 | Single-threaded Aji: ownership, regions, effects, capabilities and resources verified; file-copy and TCP echo run in the interpreter |
| M2 — Concurrent Aji | P3, P4, P5 | Structured tasks, channels, locks, islands and atomics with deterministic and randomized scheduling |
| M3 — Source language | P6 | All reference programs written as .aji |
| M4 — Native | P7 | LLVM backend; interpreter and native agree on the whole corpus |
| M5 — Agent-ready | P8 | ajid protocol and benchmark; candidate for Aji 0.1 |
Phases
| Phase | File | Goal | Exit criterion | Blocking questions |
|---|---|---|---|---|
| P0 | phase-0-semantic-skeleton.md | AIR model, text parser, CFG/SSA/type verifier, interpreter | AIR hello and arithmetic tests execute identically across runs |
resolved except Q-016 (floats reserved) |
| P1 | phase-1-ownership-and-memory.md | Frame storage, second-class borrows, arrays/slices, init tracking, bounds (RFC 0005) | file-copy core on a local buffer; alias/dangling/escape/uninit/OOB rejected | resolved (Q-009, Q-010) |
| P2 | phase-2-effects-capabilities-resources.md | Effects, capabilities, heap (Own), regions, linear resources, runtime intrinsics |
safe file-copy and basic TCP echo | Q-011, Q-012, Q-018 |
| P3 | phase-3-structured-concurrency.md | Task scopes, Send/Share, channels, mutex, cancellation, deterministic scheduler | parallel-map and channel ownership-transfer examples | Q-013, Q-014 |
| P4 | phase-4-islands.md | Islands, iref, transfer, freeze, Frozen, Arc |
cyclic graph moves between tasks with no deep copy and no shared mutation | — |
| P5 | phase-5-atomics-and-memory-model.md | Atomics, orderings, fences, weak-memory interpreter, schedule exploration, replay | atomic publication litmus/conformance tests | Q-015, Q-017 |
| P6 | phase-6-source-language.md | .aji parser, lowering, generics, contracts, formatter |
all reference programs authored primarily as .aji |
— |
| P7 | phase-7-native-backend.md | LLVM lowering, native runtime, three targets, ABI tests | interpreted and native executions pass the same corpus | — |
| P8 | phase-8-agent-protocol.md | ajid, inspect/trace, verification report; benchmark harness per the evaluation protocol |
external agent implements/repairs a reference task using only protocol + spec | — |
Dependency graph
P0 ──► P1 ──► P2 ──► P3 ──► P4
│ │
└──────┴──► P5 ──► P6 ──► P7 ──► P8
Allowed overlap:
- spec-gate tasks of a later phase may start any time;
- P6 grammar work (P6-1) may start after P2, since syntax does not affect AIR semantics;
- P8 protocol design (P8-1) may start after P2;
ajidwrapscheck.zig, which exists from P0.
Error code coverage
Every registry code (../reference/error-codes.md) has a phase that must implement it with an accept/reject pair.
| Code | Phase | Code | Phase | |
|---|---|---|---|---|
| E1001 type.mismatch | P0 | E3101 effect.undeclared | P2 | |
| E1002 type.invalid_cast | P0 | E3201 capability.missing | P2 | |
| E1010 init.read_uninitialized | P1 | E3202 capability.widen | P2 | |
| E2001 ownership.use_after_move | P2 | E4001 concurrency.not_send | P3 | |
| E2002 ownership.double_consume | P2 | E4002 concurrency.not_share | P3 | |
| E2101 borrow.mutable_alias | P1 | E4101 concurrency.possible_data_race | P3 | |
| E2102 borrow.outlives_owner | P1 | E4201 atomic.invalid_order | P5 | |
| E2103 memory.out_of_bounds | P1 | E4301 task.live_child_escape | P3 | |
| E2104 memory.region_generation | P2 | E4302 task.borrow_escape | P3 | |
| E2110 island.escape | P4 | E4303 io.buffer_in_flight | P7 (reserved) | |
| E2111 island.foreign_mutable_edge | P4 | E5001 air.invalid_ssa | P0 | |
| E3001 resource.use_after_consume | P2 | E5002 air.invalid_cfg | P0 | |
| E3002 resource.leak | P2 | E5101 verifier.resource_limit | P0 | |
| E6001 unsafe.required | P2 | E6101 abi.unaligned_reference | P7 | |
| E2105 borrow.not_ended | P1 | E2106 borrow.use_after_end | P1 | |
| E2107 borrow.not_owned | P1 | E2108 borrow.escapes_frame | P1 | |
| E0001–E0006, E1003 | P0 | T0001–T0007 P0, T0008 | P1 |
Cross-cutting tracks
These run through all phases rather than belonging to one.
| Track | Rule |
|---|---|
| Spec | Each phase's first tasks update ../spec/ and the open-questions log. RFCs are proposed for acceptance in the phase that implements them (0001 in P1, 0002 in P3, 0003 in P5; 0004 was accepted after P0); acceptance integrates their rules into the spec in the same change. New constructs extend format 0 only under spec 07 §8.7. |
| Diagnostics | New codes are added to ../reference/error-codes.md and src/diag.zig together; structured fields per code are documented in the spec section that defines the rule. |
| Determinism | Every run test is executed twice and compared from P0-12 on; concurrency tests add schedule stress from P3. |
| Audit reports | Each phase that adds an auditable fact (unsafe sites, effects, capabilities, weak atomics, eliminated checks) extends the report in src/report/ (spec 10 §6, spec 13 §5). |
| Features | Every phase from P1 publishes its feature bundles (../reference/air-features.md) when their semantics are specified, and adds them to supported when implemented. aji features is the discovery interface for agents. |
| Packages | Minimal aji.toml reading for capabilities in P2; dependencies, lockfile and sandboxed build extensions in P8 (spec 12). |
Evaluation track (spec 14, ../evaluation/protocol.md)
Evaluation runs alongside the phases; each stage starts when the language features it needs are implemented.
| ID | Status | Task | Depends | Done when |
|---|---|---|---|---|
| E0-1 | done | Define the Agent Reference Bundle (spec 14 §3.7) and a deterministic size measurement (bytes and tokens) recorded per release | — | docs/agent/bundle.txt, zig build agent-reference, tools/agent_bundle_tokens.py; Phase 2 baseline recorded; measured in CI |
| E0-2 | todo | (owner, outside this repository and outside the language developer's conversation) Private benchmark repository: a benchmark-authoring agent in a clean context designs the two smoke tasks from the brief in docs/evaluation/benchmark-authoring.md; later T01–T04; dev/validation/test split |
— | evaluator hashes published; nothing hidden in this repository |
| E0-3 | done | Language-neutral agent scaffold and run recorder (protocol §5, §28) | — | tools/eval/, docs/evaluation/harness.md; one loop drives Aji, Rust and Zig (self-tests on dev-echo); every run record complete |
| E0-4 | todo | Rust and Zig baseline solutions and pinned local documentation | E0-2 | baselines pass the hidden tests |
| E-C | todo | Model calibration: models labelled M1–M3 run 5–10 neutral coding tasks unrelated to Aji in tools/eval; classes assigned from scores; live dev-echo per model (protocol §2, §39a) |
E0-3 | calibration report; model IDs, endpoints and reasoning modes frozen |
| E-G | todo | Gate before E-N (and later E-S): private tasks reviewed; evaluator, task and evaluator hashes frozen; Rust, Zig and Aji/AIR references written by separate clean agents pass; Aji commit, bundle, toolchains and docs frozen with ajieval freeze (checklist in docs/evaluation/benchmark-authoring.md) |
E0-2, E0-4 | all gates pass |
| E-S | todo | Engineering smoke test, Track A: 2 families (binary/stream parser, concurrent bounded pipeline) × 3 languages × 3 models (M1–M3) × 2 runs = 36 runs on one Aji commit (protocol §39a); plan shape docs/evaluation/smoke-plan.example.json; failures classified by cause after the matrix, before any language change |
E-C, E-G | harness, bundle sufficiency, accounting and traces verified |
| E-N0 | done | Native dev-echo gate (Aji/AIR): Codex + gpt-6.1-sol (effort high), Claude Code + claude-opus-5-5 (effort high), OpenCode + zai-coding-plan/glm-5.3-flash all accepted; networkless shell for all three verified by dev-netprobe; context metrics (provider / cumulative / unique reference) |
E0-3 | ajieval native, ajieval freeze, ajieval journal |
| E-N | done | Track B native smoke (2026-10-05): 18 runs, 17 accepted; Codex and Claude Code 12/12 (ceiling), OpenCode/GLM Rust 2/2, Zig 2/2, Aji/AIR 1/2 (one BUDGET failure). No compression signal at this difficulty; Aji/AIR costs more time, tool calls and uncached input for every agent (fixed bundle reading ≈30–36k unique tokens per run; Rust runs read no docs). Infrastructure goals met. Not evidence (protocol §39a/§39b) | E-N0, E0-2, E-G | docs/evaluation/results/2026-10-05-native-smoke.md (tasks under aliases); analysis per §38 done |
| E-A | todo | Stage A pilot (condition Aji/AIR): T01–T04 families × Aji/Rust/Zig × 3 model classes × 3 runs = 108 runs (protocol §39); not headline evidence |
E-S, basic Phase 3 | pilot report: effect size, broken tasks, cost, instrumentation |
| E-B | todo | Stage B: T05–T07 | Phase 3 | stage report |
| E-C | todo | Stage C: T08, litmus repair | Phase 5 | stage report |
| E-D | todo | Stage D: T09, T10 | Phases 3–5, stable features | stage report |
| E-E | todo | Stage E: maintenance campaign M1–M8 | E-D | stage report |
| E-1 | todo | First confirmatory experiment: 8 held-out tasks × 3 languages × 4 model classes × 6 runs = 576 runs (protocol §40); thresholds frozen beforehand (§35) | E-A fixes | published evaluation |
Until Phase 6 delivers the source language, Aji runs use the condition Aji/AIR; after Phase 6, Aji/source is evaluated as a separate condition.
Roadmap after the native smoke (owner decision, 2026-10-05). The smoke showed that agents pay mostly for writing compiler IR by hand, not for Aji's semantics:
- SSA and CFG errors dominated;
- AIR is about 3× the size of Rust;
- the ~33k-token bundle is read in full.
Phase 6 therefore comes forward as Phase 6A: a minimal .aji frontend over the frozen semantics of Phases 0–3, lowering to the same AIR that the same verifier checks. Phases 4 and 5 are paused. The order is:
- Phase 6A:
.ajifrontend for all of Phases 0–3 (RFC 0013). - In parallel, generic improvements without semantic change: an Agent Quick Reference (5–8k tokens) with an index into the full reference; repair-oriented diagnostics (
E0006canonical header, done). - Engineering regression on the old tasks M and C, which are dev material now:
Aji/AIRvsAji/source. Measure source size, output tokens, tool calls and bundle use. - A new private held-out benchmark (clean-context author), harder by the number of interacting invariants (resource ownership + cancellation + bounded memory + several tasks + failure paths + changing existing code), not by size.
- Native and controlled runs over the conditions
Rust,Zig,Aji/AIRandAji/sourceon Codex, Claude Code and GLM, with a weaker model added if needed.Aji/AIR → Aji/sourcemeasures the price of the representation;Rust/Zig → Aji/sourcemeasures the effect of the semantics, the verifier and the language.
Targets for Phase 6A, measured on dev tasks:
| Quantity | Target |
|---|---|
| source size | ≤ 1.5× Rust |
| agent output tokens | ≤ 2× Rust |
| SSA/CFG diagnostics written by the agent | effectively 0 |
| feature-header diagnostics | 0 (the frontend infers the feature closure) |
| safety guarantees | unchanged, because the same AIR is verified |
Task conventions
- IDs are
P<phase>-<n>and never reused. A task split later becomesP1-4a,P1-4b. - Status lives in the phase file's task table:
todo,doing,done,dropped. Update it in the same change that completes the task. Done whenis the acceptance test. If it cannot be checked mechanically, rewrite it.- Discovered work goes into the current phase file as a new task, or into
../design/open-questions.mdif it is a spec gap.
Status
| Phase | Status |
|---|---|
| P0 | done; AIR format 0 frozen as the semantic baseline (spec 07 §8.7) |
| P1 | done (exit review in the phase file) |
| P2 | done (exit review in the phase file) |
| P3 | done (exit review in the phase file); P3-10, P3-11 moved to P7 |
| P6A | next: minimal .aji frontend over Phases 0–3 (RFC 0013), brought forward after the native smoke |
| P4, P5 | paused until P6A and the next held-out experiment |
| P7, P8 | not started |