Files
aji/docs/plan
dev 4f084decce cli: add whole-value linear aggregates
Implement STD-5 through source, AIR, verifier and deterministic interpreter.
Constructors consume nested owners; exhaustive unpack/take, explicit swap and
own.pack preserve ownership on success and failure. Support owning Option and
Result while keeping classification helpers Copy-only. Preserve borrow identity
across whole replacement and collection; distinguish individual owned arrays
from repeated heap arrays.

Specify feature contracts, invariants, diagnostics, compatibility and measured
source/AIR budgets in RFC 0023 and normative docs. Add canonical round trips,
AIR/source acceptance and rejection fixtures, CLI integration and CI checks.

Validate build, unit/extended tests, full conformance, forced-collection schedule
stress (32 seeds per quantum), hosted smoke, CLI suites, source coverage (88/88),
formatting and reference bundle generation. Source bundle grows 3.2%; Quick
Reference grows 4.0%. No MCC improvement is claimed.

Dynamic initialized linear buffers and explicit drain remain Q-036/STD-6;
frame/region/repeated heap storage is Copy-only. RFC remains Proposed.
2026-10-06 21:23:52 +03:00
..

Implementation Plan

Non-normative. The order in which the Zig reference implementation is built, and how work is split into tasks. The spec defines what to build; this plan defines when.

Sequencing principles

  1. Semantics before speed. Interpreter and verifier define the language. No native code until the conformance corpus is stable (DD-007).
  2. AIR before source. AIR is the conformance format. The .aji frontend comes after the core semantics are executable.
  3. Spec gate first in every phase. Each phase opens by resolving its open questions (../design/open-questions.md) and writing the instruction contracts (spec 07 §4) for the opcodes it introduces. Code that implements unspecified behavior is not merged.
  4. Tests before code. Every verifier rule lands with an accept/reject conformance pair and a stable diagnostic code.
  5. Exit criteria are executable. A phase is done when its exit criterion passes in zig build conformance, not when its tasks are ticked.
  6. One task, one change. A task is sized for one agent session and one reviewable change.

Milestones

Milestone Phases Result
M1 — Verified core P0, P1, P2 Single-threaded Aji: ownership, regions, effects, capabilities and resources verified; file-copy and TCP echo run in the interpreter
M2 — Concurrent Aji P3, P4, P5 Structured tasks, channels, locks, islands and atomics with deterministic and randomized scheduling
M3 — Source language P6 All reference programs written as .aji
M4 — Native P7 LLVM backend; interpreter and native agree on the whole corpus
M5 — Agent-ready P8 ajid protocol and benchmark; candidate for Aji 0.1

Phases

Phase File Goal Exit criterion Blocking questions
P0 phase-0-semantic-skeleton.md AIR model, text parser, CFG/SSA/type verifier, interpreter AIR hello and arithmetic tests execute identically across runs resolved except Q-016 (floats reserved)
P1 phase-1-ownership-and-memory.md Frame storage, second-class borrows, arrays/slices, init tracking, bounds (RFC 0005) file-copy core on a local buffer; alias/dangling/escape/uninit/OOB rejected resolved (Q-009, Q-010)
P2 phase-2-effects-capabilities-resources.md Effects, capabilities, heap (Own), regions, linear resources, runtime intrinsics safe file-copy and basic TCP echo Q-011, Q-012, Q-018
P3 phase-3-structured-concurrency.md Task scopes, Send/Share, channels, mutex, cancellation, deterministic scheduler parallel-map and channel ownership-transfer examples Q-013, Q-014
P4 phase-4-islands.md Islands, iref, transfer, freeze, Frozen, Arc cyclic graph moves between tasks with no deep copy and no shared mutation —
P5 phase-5-atomics-and-memory-model.md Atomics, orderings, fences, weak-memory interpreter, schedule exploration, replay atomic publication litmus/conformance tests Q-015, Q-017
P6 phase-6-source-language.md .aji parser, lowering, generics, contracts, formatter all reference programs authored primarily as .aji —
P7 phase-7-native-backend.md LLVM lowering, native runtime, three targets, ABI tests interpreted and native executions pass the same corpus —
P8 phase-8-agent-protocol.md ajid, inspect/trace, verification report; benchmark harness per the evaluation protocol external agent implements/repairs a reference task using only protocol + spec —

Dependency graph

P0 ──► P1 ──► P2 ──► P3 ──► P4
                      │      │
                      └──────┴──► P5 ──► P6 ──► P7 ──► P8

Allowed overlap:

  • spec-gate tasks of a later phase may start any time;
  • P6 grammar work (P6-1) may start after P2, since syntax does not affect AIR semantics;
  • P8 protocol design (P8-1) may start after P2; ajid wraps check.zig, which exists from P0.

Error code coverage

Every registry code (../reference/error-codes.md) has a phase that must implement it with an accept/reject pair.

Code Phase Code Phase
E1001 type.mismatch P0 E3101 effect.undeclared P2
E1002 type.invalid_cast P0 E3201 capability.missing P2
E1010 init.read_uninitialized P1 E3202 capability.widen P2
E2001 ownership.use_after_move P2 E4001 concurrency.not_send P3
E2002 ownership.double_consume P2 E4002 concurrency.not_share P3
E2101 borrow.mutable_alias P1 E4101 concurrency.possible_data_race P3
E2102 borrow.outlives_owner P1 E4201 atomic.invalid_order P5
E2103 memory.out_of_bounds P1 E4301 task.live_child_escape P3
E2104 memory.region_generation P2 E4302 task.borrow_escape P3
E2110 island.escape P4 E4303 io.buffer_in_flight P7 (reserved)
E2111 island.foreign_mutable_edge P4 E5001 air.invalid_ssa P0
E3001 resource.use_after_consume P2 E5002 air.invalid_cfg P0
E3002 resource.leak P2 E5101 verifier.resource_limit P0
E6001 unsafe.required P2 E6101 abi.unaligned_reference P7
E2105 borrow.not_ended P1 E2106 borrow.use_after_end P1
E2107 borrow.not_owned P1 E2108 borrow.escapes_frame P1
E0001–E0006, E1003 P0 T0001–T0007 P0, T0008 P1

Cross-cutting tracks

These run through all phases rather than belonging to one.

Track Rule
Spec Each phase's first tasks update ../spec/ and the open-questions log. RFCs are proposed for acceptance in the phase that implements them (0001 in P1, 0002 in P3, 0003 in P5; 0004 was accepted after P0); acceptance integrates their rules into the spec in the same change. New constructs extend format 0 only under spec 07 §8.7.
Diagnostics New codes are added to ../reference/error-codes.md and src/diag.zig together; structured fields per code are documented in the spec section that defines the rule.
Determinism Every run test is executed twice and compared from P0-12 on; concurrency tests add schedule stress from P3.
Audit reports Each phase that adds an auditable fact (unsafe sites, effects, capabilities, weak atomics, eliminated checks) extends the report in src/report/ (spec 10 §6, spec 13 §5).
Features Every phase from P1 publishes its feature bundles (../reference/air-features.md) when their semantics are specified, and adds them to supported when implemented. aji features is the discovery interface for agents.
Packages Minimal aji.toml reading for capabilities in P2; dependencies, lockfile and sandboxed build extensions in P8 (spec 12).

Evaluation track (spec 14, ../evaluation/protocol.md)

Evaluation runs alongside the phases; each stage starts when the language features it needs are implemented.

ID Status Task Depends Done when
E0-1 done Define the Agent Reference Bundle (spec 14 §3.7) and a deterministic size measurement (bytes and tokens) recorded per release — docs/agent/bundle.txt, zig build agent-reference, tools/agent_bundle_tokens.py; Phase 2 baseline recorded; measured in CI
E0-2 todo (owner, outside this repository and outside the language developer's conversation) Private benchmark repository: a benchmark-authoring agent in a clean context designs the two smoke tasks from the brief in docs/evaluation/benchmark-authoring.md; later T01–T04; dev/validation/test split — evaluator hashes published; nothing hidden in this repository
E0-3 done Language-neutral agent scaffold and run recorder (protocol §5, §28) — tools/eval/, docs/evaluation/harness.md; one loop drives Aji, Rust and Zig (self-tests on dev-echo); every run record complete
E0-4 todo Rust and Zig baseline solutions and pinned local documentation E0-2 baselines pass the hidden tests
E-C todo Model calibration: models labelled M1–M3 run 5–10 neutral coding tasks unrelated to Aji in tools/eval; classes assigned from scores; live dev-echo per model (protocol §2, §39a) E0-3 calibration report; model IDs, endpoints and reasoning modes frozen
E-G todo Gate before E-N (and later E-S): private tasks reviewed; evaluator, task and evaluator hashes frozen; Rust, Zig and Aji/AIR references written by separate clean agents pass; Aji commit, bundle, toolchains and docs frozen with ajieval freeze (checklist in docs/evaluation/benchmark-authoring.md) E0-2, E0-4 all gates pass
E-S todo Engineering smoke test, Track A: 2 families (binary/stream parser, concurrent bounded pipeline) × 3 languages × 3 models (M1–M3) × 2 runs = 36 runs on one Aji commit (protocol §39a); plan shape docs/evaluation/smoke-plan.example.json; failures classified by cause after the matrix, before any language change E-C, E-G harness, bundle sufficiency, accounting and traces verified
E-N0 done Native dev-echo gate (Aji/AIR): Codex + gpt-6.1-sol (effort high), Claude Code + claude-opus-5-5 (effort high), OpenCode + zai-coding-plan/glm-5.3-flash all accepted; networkless shell for all three verified by dev-netprobe; context metrics (provider / cumulative / unique reference) E0-3 ajieval native, ajieval freeze, ajieval journal
E-N done Track B native smoke (2026-10-05): 18 runs, 17 accepted; Codex and Claude Code 12/12 (ceiling), OpenCode/GLM Rust 2/2, Zig 2/2, Aji/AIR 1/2 (one BUDGET failure). No compression signal at this difficulty; Aji/AIR costs more time, tool calls and uncached input for every agent (fixed bundle reading ≈30–36k unique tokens per run; Rust runs read no docs). Infrastructure goals met. Not evidence (protocol §39a/§39b) E-N0, E0-2, E-G docs/evaluation/results/2026-10-05-native-smoke.md (tasks under aliases); analysis per §38 done
E-A todo Stage A pilot (condition Aji/AIR): T01–T04 families × Aji/Rust/Zig × 3 model classes × 3 runs = 108 runs (protocol §39); not headline evidence E-S, basic Phase 3 pilot report: effect size, broken tasks, cost, instrumentation
E-B todo Stage B: T05–T07 Phase 3 stage report
E-C todo Stage C: T08, litmus repair Phase 5 stage report
E-D todo Stage D: T09, T10 Phases 3–5, stable features stage report
E-E todo Stage E: maintenance campaign M1–M8 E-D stage report
E-1 todo First confirmatory experiment: 8 held-out tasks × 3 languages × 4 model classes × 6 runs = 576 runs (protocol §40); thresholds frozen beforehand (§35) E-A fixes published evaluation

Until Phase 6 delivers the source language, Aji runs use the condition Aji/AIR; after Phase 6, Aji/source is evaluated as a separate condition.

Roadmap after the native smoke (owner decision, 2026-10-05). The smoke showed that agents pay mostly for writing compiler IR by hand, not for Aji's semantics:

  • SSA and CFG errors dominated;
  • AIR is about 3× the size of Rust;
  • the ~33k-token bundle is read in full.

Phase 6 therefore comes forward as Phase 6A: a minimal .aji frontend over the frozen semantics of Phases 0–3, lowering to the same AIR that the same verifier checks. Phases 4 and 5 are paused. The order is:

  1. Phase 6A: .aji frontend for all of Phases 0–3 (RFC 0013).
  2. In parallel, generic improvements without semantic change: an Agent Quick Reference (5–8k tokens) with an index into the full reference; repair-oriented diagnostics (E0006 canonical header, done).
  3. Engineering regression on the old tasks M and C, which are dev material now: Aji/AIR vs Aji/source. Measure source size, output tokens, tool calls and bundle use. Done (P6A-9): IR-form diagnostics 9 → 0, VSR 4/6 → 5/6, cost model-dependent.
  4. A new private held-out benchmark (clean-context author), harder by the number of interacting invariants (resource ownership + cancellation + bounded memory + several tasks + failure paths + changing existing code), not by size.
  5. Native and controlled runs over the conditions Rust, Zig and Aji/source on Codex, Claude Code and GLM, with a weaker model added if needed; Aji/AIR only as a research control (owner decision after P6A-9). Rust/Zig → Aji/source measures the effect of the semantics, the verifier and the language.
    • Tasks at three levels:
      • easy: a ceiling for strong models;
      • medium: near the weaker model's limit;
      • hard: beyond it.
    • H4 is expected on medium tasks where a weaker model understands the task and starts implementing, but fails on memory, resources or concurrency. In P6A-9, task C was hard for GLM: it failed before writing code in both conditions.

Targets for Phase 6A, measured on dev tasks:

Quantity Target
source size ≤ 1.5× Rust
agent output tokens ≤ 2× Rust
SSA/CFG diagnostics written by the agent effectively 0
feature-header diagnostics 0 (the frontend infers the feature closure)
safety guarantees unchanged, because the same AIR is verified

Standard library track

At the owner’s request (2026-10-06), reusable std APIs take priority in a separate work branch. Standard library plan defines the bootstrap, prerequisites (linear_aggregates, general modules and generics), Std 0.1/0.2/0.3 and the public integration gate. P7/P8 remain on hold pending B1 analysis; this track does not change frozen evaluation inputs.

Task conventions

  • IDs are P<phase>-<n> and never reused. A task split later becomes P1-4a, P1-4b.
  • Status lives in the phase file's task table: todo, doing, done, dropped. Update it in the same change that completes the task.
  • Done when is the acceptance test. If it cannot be checked mechanically, rewrite it.
  • Discovered work goes into the current phase file as a new task, or into ../design/open-questions.md if it is a spec gap.

Status

Phase Status
P0 done; AIR format 0 frozen as the semantic baseline (spec 07 §8.7)
P1 done (exit review in the phase file)
P2 done (exit review in the phase file)
P3 done (exit review in the phase file); P3-10, P3-11 moved to P7
P6A done (exit review in phase-6-source-language.md; P6A-9 results): the agent-facing source language over AIR is the architecture
P4 done (exit review in the phase file)
P5 done (exit review in the phase file): atomics through every layer; litmus 20/20 exact against the independent oracle; race detector on every run test
B1 the first held-out benchmark after Phase 5 (owner decision, 2026-10-06): pre-registration b1-heldout-plan.md Accepted; private side: independent author → references → symmetric calibration → freeze → 162 runs
P7, P8 on hold until B1 is analyzed (owner decision, 2026-10-06)