Files
aji/docs/evaluation/results/2026-10-06-p5-0.md
T

5.2 KiB
Raw Blame History

2026-10-06 — P5-0: M/C regression on the frozen Phase 4 (Aji/source)

Non-normative. This is a regression gate, not evidence for any hypothesis (protocol §39a). M and C are a regression corpus. They decide no semantic question, and the language is not tuned to them. Negative findings are kept (protocol §37).

The private side was run by a clean-context operator. This repository received only:

  • numbers;
  • diagnostic codes and their structured type fields;
  • gate names;
  • hashes;
  • a synthetic reproducer the operator wrote itself.

Setup

  • Matrix: M, C × Aji/source × 3 native agents, 6 cells. One run per cell, sequential, fresh workspace and HOME. The order was frozen before the first run (order seed 3776241291).

  • Toolchain: tag p4-frozen (702d69b).

    • AIR bundle sha256 fa621787…4c88;
    • Source Reference Bundle sha256 94cfa6a3…424b;
    • the worktree was clean before and after the matrix.
  • Same as P6A-9:

    • task versions (2) and task hashes;
    • the evaluator hash;
    • agent fingerprints (CLI version, CLI hash, configuration hash);
    • limits.

    The plan differs from P6A-9 only in languages: ["aji_source"] and the output directory.

  • No journal entries. No HTTP 429, no re-run, no infrastructure failure.

Result

Cell (frozen order) Result P6A-9 source
M · N3 PASS PASS
M · N1 PASS PASS
M · N2 PASS PASS
C · N3 PASS FAIL (no program; output length limit)
C · N2 PASS PASS
C · N1 PASS PASS

Total: 6/6, against 5/6 in P6A-9.

Against the gate fixed before the runs (plan, P5-0)

Criterion Result
R1: the four Aji references pass on p4-frozen met: M and C × AIR and source, each accepted with 8/8 gates
R2: no FAIL with a toolchain or evaluator cause met: no FAIL
R3: no IR-form code, E7900 or E1001 in source cells not met, then fixed: IR-form 0 and E7900 0, but E1001 ×4 in M · N1 (frontend defect A below)
R4: codes not seen in P6A-9 source cells E2101 ×2 in C · N1: correct verifier feedback on a genuine program error (model), repaired in one cycle. E1001: see R3
R5: a P6A-9 PASS now fails none
R6: source/AIR ratio (mechanical_air_eliminated_raw) 0.73–0.85, against 0.77–0.86 for the P6A-9 programs lowered by the same frontend. The spread follows the programs, not the toolchain

Defect A (frontend, toolchain_bug = yes).

  • The bug: a ref of an array field reached through a mut borrow was lowered as borrow.field on the mut, then slice.make. That gives slice_mut<u8> where the source said ref, and the verifier rejected the call with E1001 (expected slice<u8>, found slice_mut<u8>).
  • The same ref of a scalar field through mut was rejected by the frontend with E7005, although it is a valid program.
  • The agent worked around it by changing the parameter to slice_mut<u8>.
  • Synthetic reproducer (the operator's, unrelated to the tasks): fn g(s: mut<S>) -> usize { return f(ref s.buf); } with f(x: slice<u8>).
  • Fix: a ref borrow of a place reached through mut is now a shared reborrow (borrow.ref, spec 07a). Both cases are accepted.
  • Regression test: tests/conformance/source/typecheck/ref_through_mut.aji. It is rejected on p4-frozen and runs on the fix.
  • This is the same symptom as checkpoint 2 (N1, E1001 ×4), which led to P6A-12. P6A-12 closed the cast, slice.copy and owner cases, not this one.

Paired cells (P6A-9 → P5-0, source)

Task · agent output tokens uncached input tool calls repair cycles seconds codes in P5-0
M · N1 15.7k → 9.5k 52.1k → 52.3k 36 → 23 5 → 6 703 → 313 E1001 ×4, E7007 ×3, E7005 ×1
M · N2 20.2k → 32.8k 56.3k → 83.1k 27 → 44 5 → 2 375 → 776 E7005 ×2
M · N3 53.8k → 91.5k 221.8k → 146.8k 39 → 88 2 → 1 2 078 → 2 520 E7001 ×1
C · N1 11.6k → 14.2k 52.5k → 46.8k 27 → 28 4 → 5 475 → 429 E2101 ×2, E7005 ×1
C · N2 18.2k → 20.7k 53.3k → 57.4k 20 → 22 1 → 1 269 → 387 E7007 ×1
C · N3 41.0k (no program) → 56.3k — → 171.6k 15 → 39 — → 0 1 086 → 1 369 none

These columns are reported only. With one run per cell they are noise.

The Quick Reference grew by about 550 tokens with §7 Graphs (quick_reference_unique 3 568 → 4 123), so the documentation columns are not comparable one to one.

Harness notes

  • ajieval checkpoint lowers both sides with the current toolchain. The P6A-9 programs were re-lowered here with p4-frozen, so their ratios differ from the values recorded in the P6A-9 results.
  • The operator's first report named the two private task ids. The names were not copied anywhere in this repository.

Verdict (owner, 2026-10-06)

PASS. No rerun.

Regression passed; one latent frontend defect was discovered and subsequently fixed.

  • No evaluator or toolchain problem invalidated a cell.
  • The fix comes with its own regression test.
  • For a scientific comparison, metrics of this frozen run must not be mixed with a later commit. For the go/no-go gate this result is sufficient.