Files
aji/docs/evaluation
dev 2ee1ff192f eval: evaluator environment, evaluator.log, ajieval evaluate
The evaluator now receives AJIEVAL_LANGUAGE, AJIEVAL_TOOLCHAIN_PATH and
AJIEVAL_TOOLCHAIN_DIRS (the toolchain exactly as the agent's sandbox had
it), its full output is saved as evaluator.log in the run directory, and
ajieval evaluate runs an evaluator on any workspace exactly as the
harness does. harness.md documents what a sandboxing evaluator should do
(bind the toolchain dirs, private CARGO_HOME + --offline, build without
the agent's target/ and caches, report infrastructure failures
distinctly).
2026-10-04 19:40:23 +03:00
..

Evaluation

Non-normative. Empirical validation of the Aji hypothesis stated in spec 14: that the language, verifier and runtime take over enough reasoning for weaker models to write correct systems software at lower cost (Model Capability Compression).

Document Purpose
benchmark-authoring.md Separation of roles for E0-2 and E-G: benchmark author and reference writers in clean contexts; brief; gate checklist
harness.md Agent scaffold and run recorder (E0-3): task format, evaluator contract, run record, commands
protocol.md Agent Language Evaluation Protocol 0.2: variables, benchmark families T01–T10, conditions Aji/AIR and Aji/source, maintenance and seeded-bug benchmarks, metrics, statistics, stages A–E, success and falsification criteria
../agent/README.md Agent Reference Bundle: contents, measurement, growth policy, milestones

Integrity rules (protocol §7, §29; spec 14 §12)

  • This public repository contains only the protocol and dev material. Hidden tests, evaluators and reference implementations of the validation and test sets live in a separate private benchmark repository.
  • Agents used to develop the language (including the agent working in this repository) MUST NOT see the held-out corpus.
  • Language features MUST NOT be introduced to improve a specific benchmark task; benchmark failures are classified first (protocol §38).
  • Negative results are kept and reported (protocol §37).

Stages and language milestones

Stage Tasks Requires Status
A — Phase 2 validation T01–T04 Phase 2 (heap, regions, resources, capabilities, effects, deterministic I/O) language ready; harness done (E0-3); tasks and baselines pending (E0-2, E0-4)
B — Phase 3 validation T05–T07 Phase 3 (structured concurrency, schedule exploration) language ready; infrastructure: harness done (E0-3), tasks pending (E0-2)
C — Atomic validation T08, litmus repair Phase 5 (atomics, memory model) blocked on Phase 5
D — Systems integration T09, T10 Phases 3–5; stable features blocked
E — Maintenance campaign M1–M8 on T03, T07, T09, T10 D blocked

Until the source language (Phase 6) exists, Aji runs use the condition Aji/AIR: the agent writes text AIR directly. This is a deliberate experiment, not a stopgap: if AIR alone helps weaker models, that is strong evidence, and after Phase 6 Aji/source is compared against Aji/AIR.

Order (protocol §30a): bundle baseline (done) → Phase 3 → second bundle measurement → private benchmark repository (in parallel) → harness → 36-run smoke test (§39a) → 108-run Stage A pilot.