- plan/README.md: sequencing principles, milestones M1-M5, phase table with exit criteria and blocking questions, dependency graph, error-code -> phase coverage, cross-cutting tracks, task conventions - phase-0..phase-8 files: scope, invariants, task tables (P<N>-<k>) with dependencies, outputs and mechanical "done when" checks
2.2 KiB
2.2 KiB
Phase 8 — Agent protocol
Non-normative. Part of the implementation plan.
Goal: a long-running machine interface (ajid) and audit artifacts that let an external coding agent implement and repair Aji programs without reading prose diagnostics; a benchmark that measures whether Aji achieves its mission.
Exit criterion: an external coding agent implements or repairs a reference task using only the protocol and the repository spec.
Spec inputs: spec 10, 12, 13 §5; plan/conformance-suite.md (agent benchmark).
Tasks
| ID | Status | Task | Depends | Output | Done when |
|---|---|---|---|---|---|
| P8-1 | todo | Specify ajid transport and method schemas (parse, typecheck, verify, compile, run, test, trace, inspect, explain, benchmark) |
— (may start after P2) | spec 10 | request/response schemas versioned and published |
| P8-2 | todo | ajid server over check.zig: parse, typecheck, verify, run, test |
P8-1 | src/ajid/ |
protocol conformance tests; responses deterministic |
| P8-3 | todo | trace and inspect: verifier state summaries per value and instruction |
P8-2 | src/ajid/ |
an agent can query ownership/borrow state at any instruction |
| P8-4 | todo | explain and repair-candidate coverage for every registry code |
P8-2 | src/diag.zig, spec 10 |
every code has structured fields and at least one repair candidate kind |
| P8-5 | todo | Verification report artifact (spec 10 §6) combining all src/report/ outputs |
P8-2 | aji report |
single deterministic JSON document; schema documented |
| P8-6 | todo | Packages: dependencies, lockfile, content addressing, sandboxed declared build extensions | — | spec 12, src/pkg/ |
dependency resolution is deterministic; unsafe dependencies reported separately |
| P8-7 | todo | Benchmark harness: Aji vs Zig, Rust, C on shared task specs | P8-2 | bench/ |
records P(correct | one iteration), iterations, tokens, defects |
| P8-8 | todo | External agent trial on a reference task | P8-2…P8-5 | trial report in docs/plan/ |
exit criterion passes |
| P8-9 | todo | Phase exit review; Aji 0.1 release-candidate checklist | all | plan status | all phases done; spec status updated |