- reference/air-features.md: normative feature registry (arrays, atomics, capabilities, channels, effects, islands, ownership, regions, sync, tasks; all reserved), dependency closures, reasons for E0006 - spec 07 §8.1/§8.5/§8.7: features are mandatory, validated before the body, full dependency closure declared, sorted canonically; every extension belongs to a feature; published feature semantics immutable - spec 05 §8: features vs effects vs capabilities - src/air/features.zig: registry, validation, sync test with the docs - parser validates features first; E0006 carries `reason` - `aji features` prints supported AIR format, language and features - conformance: unknown, reserved and duplicate feature tests - plan: feature publication tasks in phases 1-5
3.8 KiB
Phase 3 — Structured concurrency
Non-normative. Part of the implementation plan.
Goal: tasks that cannot outlive their scopes, ownership transfer through bounded channels, synchronized shared state, cooperative cancellation, and a deterministic scheduler.
Exit criterion: parallel_map and channel_transfer examples run under deterministic and randomized schedules.
Spec inputs: spec 04 §1–19, 11 §3, §5–6. RFC 0002 is proposed for acceptance (owner decision); acceptance integrates it into the spec.
Blocking questions: Q-013 deterministic select and seeds, Q-014 Send/Share for capability-holding aggregates. (Q-019 is resolved: fuel, schedule budget and quantum are defined in spec 11 §7.)
Invariants (AGENTS.md change checklist applies to every task here)
- no child task outlives its scope; no silent detachment;
- values moved into migratable tasks are
Send; concurrently read values areShare; - concurrent mutable borrows are proven disjoint;
- buffers owned by in-flight async operations are inaccessible;
- every interpreter run is reproducible from its seed.
Tasks
| ID | Status | Task | Depends | Output | Done when |
|---|---|---|---|---|---|
| P3-1 | todo | Resolve Q-013, Q-014; propose RFC 0002 for acceptance | — | spec 04, 11 | questions resolved |
| P3-2 | todo | Contract tables: task.*, thread.*, channel.*, mutex.*, rwlock.*, select |
P3-1 | spec 07 appendix | all spec 07 §4 fields including synchronization effects |
| P3-2a | todo | Publish features tasks, channels, sync |
P3-2 | reference/air-features.md, src/air/features.zig |
feature_not_declared / missing_dependency tests |
| P3-3 | todo | Deterministic scheduler: seeds, choice points, choice log; global fuel across tasks and a separate quantum (spec 11 §7.2) |
P3-2 | src/interp/sched.zig |
same seed ⇒ identical trace; choice log replays a run; fuel is the sum over all tasks |
| P3-4 | todo | Send/Share/Local derivation | P3-1 | src/verifier/send_share.zig |
E4001, E4002 accept/reject |
| P3-5 | todo | Task-scope verifier and scoped borrows | P3-2 | src/verifier/tasks.zig |
E4301, E4302 accept/reject |
| P3-6 | todo | Concurrent alias / data-race rejection | P3-5 | src/verifier/borrow.zig |
E4101 accept/reject; disjoint split_mut halves accepted in two tasks |
| P3-7 | todo | Interpreter tasks: spawn, join, cancel, cancellation points, shields, task failure | P3-3 | src/interp/ |
cancellation observed only at defined points; shield defers it |
| P3-8 | todo | Bounded and rendezvous channels with ownership transfer | P3-7 | interpreter + verifier | sender cannot use moved message (E2001); capacity 0 rendezvous test |
| P3-9 | todo | Mutex and RwLock with linear guards | P3-7 | interpreter + verifier | guard not Send; unlock consumes guard; E3002 on leaked guard |
| P3-10 | todo | Async I/O buffer claims | P3-7 | verifier + runtime | E4303 accept/reject |
| P3-11 | todo | Blocking effect and blocking pool policy | P3-7 | spec 04 §18, runtime | thread.block from ordinary task handled per spec |
| P3-12 | todo | Runner: seed:/schedules:/quantum: headers (schedule budget kept separate from fuel); stress modes (1/2/N workers, random, forced yield, slow consumer, cancellation during waits, I/O reordering) |
P3-3 | tools/conformance.zig |
stress modes selectable; failing seed printed for replay |
| P3-13 | todo | Reference programs: parallel-map, channel transfer, tcp-echo with tasks | P3-8, P3-9 | tests/programs/ |
pass under all stress modes |
| P3-14 | todo | Phase exit review | all | plan status | exit criterion passes |
Conformance tests to add
Negative corpus entries owned by this phase: non-Send transfer, non-Share concurrent read, task escape, async buffer use while in flight. Plus E4101, E4302. Scheduler tests for every synchronization primitive (testing policy in AGENTS.md).