Files
aji/docs/plan
dev 7f4ce71d44 Phase 2: heap, regions and allocation budgets (RFC 0008)
- air: own<T>, own_array<T>, region, alloc_error; own.new/array/take/
  free, region.create/new/array/reset/destroy; mem.alloc budget form;
  linear contents of owners gated by linear_aggregates
- verifier: allocation types and capability kind (E1001, E3201),
  mem.alloc effect (E3101), ok/err counts; borrow-typed block params
  checked in the CFG stage with the region-allocation exception; linear
  owners and regions (E3002, E3001, E2001, E2002, E2101); region
  allocations as disjoint exclusive children of the shared region
  borrow; E2104 when reset/destroy would invalidate a live reference
- interp: live-byte budgets charged along the narrowing chain, shared by
  copies, mandatory in the deterministic profile; heap cells; regions
  return quota only on reset/destroy
- conformance: 25 heap/region tests including a 64 KiB region file copy;
  4000 mutants without a crash
2026-10-04 14:26:34 +03:00
..

Implementation Plan

Non-normative. The order in which the Zig reference implementation is built, and how work is split into tasks. The spec defines what to build; this plan defines when.

Sequencing principles

  1. Semantics before speed. Interpreter and verifier define the language. No native code until the conformance corpus is stable (DD-007).
  2. AIR before source. AIR is the conformance format. The .aji frontend comes after the core semantics are executable.
  3. Spec gate first in every phase. Each phase opens by resolving its open questions (../design/open-questions.md) and writing the instruction contracts (spec 07 §4) for the opcodes it introduces. Code that implements unspecified behavior is not merged.
  4. Tests before code. Every verifier rule lands with an accept/reject conformance pair and a stable diagnostic code.
  5. Exit criteria are executable. A phase is done when its exit criterion passes in zig build conformance, not when its tasks are ticked.
  6. One task, one change. A task is sized for one agent session and one reviewable change.

Milestones

Milestone Phases Result
M1 — Verified core P0, P1, P2 Single-threaded Aji: ownership, regions, effects, capabilities and resources verified; file-copy and TCP echo run in the interpreter
M2 — Concurrent Aji P3, P4, P5 Structured tasks, channels, locks, islands and atomics with deterministic and randomized scheduling
M3 — Source language P6 All reference programs written as .aji
M4 — Native P7 LLVM backend; interpreter and native agree on the whole corpus
M5 — Agent-ready P8 ajid protocol and benchmark; candidate for Aji 0.1

Phases

Phase File Goal Exit criterion Blocking questions
P0 phase-0-semantic-skeleton.md AIR model, text parser, CFG/SSA/type verifier, interpreter AIR hello and arithmetic tests execute identically across runs resolved except Q-016 (floats reserved)
P1 phase-1-ownership-and-memory.md Frame storage, second-class borrows, arrays/slices, init tracking, bounds (RFC 0005) file-copy core on a local buffer; alias/dangling/escape/uninit/OOB rejected resolved (Q-009, Q-010)
P2 phase-2-effects-capabilities-resources.md Effects, capabilities, heap (Own), regions, linear resources, runtime intrinsics safe file-copy and basic TCP echo Q-011, Q-012, Q-018
P3 phase-3-structured-concurrency.md Task scopes, Send/Share, channels, mutex, cancellation, deterministic scheduler parallel-map and channel ownership-transfer examples Q-013, Q-014
P4 phase-4-islands.md Islands, iref, transfer, freeze, Frozen, Arc cyclic graph moves between tasks with no deep copy and no shared mutation —
P5 phase-5-atomics-and-memory-model.md Atomics, orderings, fences, weak-memory interpreter, schedule exploration, replay atomic publication litmus/conformance tests Q-015, Q-017
P6 phase-6-source-language.md .aji parser, lowering, generics, contracts, formatter all reference programs authored primarily as .aji —
P7 phase-7-native-backend.md LLVM lowering, native runtime, three targets, ABI tests interpreted and native executions pass the same corpus —
P8 phase-8-agent-protocol.md ajid, inspect/trace, verification report, benchmark external agent implements/repairs a reference task using only protocol + spec —

Dependency graph

P0 ──► P1 ──► P2 ──► P3 ──► P4
                      │      │
                      └──────┴──► P5 ──► P6 ──► P7 ──► P8

Allowed overlap:

  • spec-gate tasks of a later phase may start any time;
  • P6 grammar work (P6-1) may start after P2, since syntax does not affect AIR semantics;
  • P8 protocol design (P8-1) may start after P2; ajid wraps check.zig, which exists from P0.

Error code coverage

Every registry code (../reference/error-codes.md) has a phase that must implement it with an accept/reject pair.

Code Phase Code Phase
E1001 type.mismatch P0 E3101 effect.undeclared P2
E1002 type.invalid_cast P0 E3201 capability.missing P2
E1010 init.read_uninitialized P1 E3202 capability.widen P2
E2001 ownership.use_after_move P2 E4001 concurrency.not_send P3
E2002 ownership.double_consume P2 E4002 concurrency.not_share P3
E2101 borrow.mutable_alias P1 E4101 concurrency.possible_data_race P3
E2102 borrow.outlives_owner P1 E4201 atomic.invalid_order P5
E2103 memory.out_of_bounds P1 E4301 task.live_child_escape P3
E2104 memory.region_generation P2 E4302 task.borrow_escape P3
E2110 island.escape P4 E4303 io.buffer_in_flight P3
E2111 island.foreign_mutable_edge P4 E5001 air.invalid_ssa P0
E3001 resource.use_after_consume P2 E5002 air.invalid_cfg P0
E3002 resource.leak P2 E5101 verifier.resource_limit P0
E6001 unsafe.required P2 E6101 abi.unaligned_reference P7
E2105 borrow.not_ended P1 E2106 borrow.use_after_end P1
E2107 borrow.not_owned P1 E2108 borrow.escapes_frame P1
E0001–E0006, E1003 P0 T0001–T0007 P0, T0008 P1

Cross-cutting tracks

These run through all phases rather than belonging to one.

Track Rule
Spec Each phase's first tasks update ../spec/ and the open-questions log. RFCs are proposed for acceptance in the phase that implements them (0001 in P1, 0002 in P3, 0003 in P5; 0004 was accepted after P0); acceptance integrates their rules into the spec in the same change. New constructs extend format 0 only under spec 07 §8.7.
Diagnostics New codes are added to ../reference/error-codes.md and src/diag.zig together; structured fields per code are documented in the spec section that defines the rule.
Determinism Every run test is executed twice and compared from P0-12 on; concurrency tests add schedule stress from P3.
Audit reports Each phase that adds an auditable fact (unsafe sites, effects, capabilities, weak atomics, eliminated checks) extends the report in src/report/ (spec 10 §6, spec 13 §5).
Features Every phase from P1 publishes its feature bundles (../reference/air-features.md) when their semantics are specified, and adds them to supported when implemented. aji features is the discovery interface for agents.
Packages Minimal aji.toml reading for capabilities in P2; dependencies, lockfile and sandboxed build extensions in P8 (spec 12).

Task conventions

  • IDs are P<phase>-<n> and never reused. A task split later becomes P1-4a, P1-4b.
  • Status lives in the phase file's task table: todo, doing, done, dropped. Update it in the same change that completes the task.
  • Done when is the acceptance test. If it cannot be checked mechanically, rewrite it.
  • Discovered work goes into the current phase file as a new task, or into ../design/open-questions.md if it is a spec gap.

Status

Phase Status
P0 done; AIR format 0 frozen as the semantic baseline (spec 07 §8.7)
P1 done (exit review in the phase file)
P2 in progress: RFCs 0006 (effects, capabilities), 0007 (I/O, resources, deterministic profile) and 0008 (heap, regions, budgets) implemented; next unsafe boundaries, hosted profile, audit reports, aji.toml grants
P3–P8 not started