- scope s { … }: task.scope.begin, task.scope.end at every normal exit
(scope ends generalized: borrow.end or task.scope.end, innermost first)
- task.spawn(s, f, args): call-like; named linear values moved (E7003);
lent borrows are bound first (inline borrow E7006); scope operand E7005
- task.join/cancel/cancelled; task<T>, sender<T>, receiver<T>, scope types
- channels: make<T>, dup, send, recv, close_sender, close_receiver; send,
recv and close_receiver are outcome matches; endpoints by name, borrowed
for the operation and ended on every edge (written `mut tx`: E7006)
- outcome rebinding: a value coming back under the name of a variable of
its type becomes the variable's value (pending(r))
- joins carry live variables only (pruned SSA): a linear value consumed
before a join does not travel to it; ordered after-walk over the
enclosing statement or tail, sibling arms not counted
- parser: a keyword after `.` is a member name (task.cancelled)
- conformance equivalence ignores schedule.choices (quantum counts AIR
instructions)
- tests: 10 run tests with AIR equivalence (Phase 3 programs), 12 rejects
(E4301, E4101 x2, E4002, E2001, E3101, E3002, E7006 x2, E7003, E0006,
E7005); Quick Reference tasks/channels programs now pass
- spec 15 §4/§6/§7, grammar, quick reference, bundle notes, plan
Documentation
Layout
| Directory | Kind | Purpose |
|---|---|---|
spec/ |
Normative | What a conforming implementation MUST do |
rfcs/ |
Decision records | Major design proposals and their rationale; accepted changes live in spec/ |
reference/ |
Normative registries | Grammar, error codes, intrinsics, type properties, litmus tests, glossary |
design/ |
Non-normative | Short design decisions and the open-questions log |
plan/ |
Non-normative | Implementation plan, per-phase task breakdowns, conformance plan |
evaluation/ |
Non-normative | Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules |
dev/ |
Non-normative | How the reference implementation is built and tested |
Precedence
The specification is the single normative source. When documents disagree (from AGENTS.md):
spec/;reference/;- examples;
- README prose.
RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.
design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.
Where to put a new document
| You are writing… | Put it in |
|---|---|
| a MUST/SHOULD rule | the matching spec/NN-*.md |
| a major change to memory, concurrency, effects, AIR or unsafe | rfcs/NNNN-title.md from rfcs/0000-template.md |
| a new error code, intrinsic or grammar rule | reference/ (and src/diag.zig for codes) |
| a new AIR feature bundle | reference/air-features.md (and src/air/features.zig) |
| a small decision with a one-paragraph reason | design/decisions.md as the next DD-NNN |
| a gap or ambiguity you found but cannot resolve now | design/open-questions.md as the next Q-NNN |
| tasks, milestones, sequencing | plan/ |
| benchmark tasks, evaluation methodology (public dev material only) | evaluation/; hidden tests go to the private benchmark repository |
| implementation architecture, conventions, test how-to | dev/ |
Reading order
New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.
Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.