Files
aji/docs
dev 154c39865f Phase 6A: .aji layer 8 (lock and mutexes, select, shields, cancellation)
- lock ref m as x { … } cancelled { … }: mutex.lock on a ref<mutex<T>>
  (a mutex is borrowed for the lock, a ref binding used as is); ok edge:
  mutex.borrow bound as x; at every normal exit borrow.end x then
  mutex.unlock; the guard is never a source value
- mutex.make/mutex.take; mutex<T> type; ref mr = m lends a mutex
- shield { … }: task.shield.begin/end at every exit (nesting by construction)
- task.check_cancel and task.join_cancel as outcome matches
- select: one borrow per endpoint, send values evaluated first and
  deduplicated, every edge binds its own value then the unsent values;
  bind count E7005, missing outcome E7004
- linear values never get frame storage (borrowed in place)
- liveness: select handled in the read and after walks
- Quick Reference: select edges bind `job` back (ok(x, job), closed(job));
  every Quick Reference example now passes (no PENDING)
- tests: 6 run tests with AIR equivalence (mutex counter, select draw,
  select same value, shield, join_cancel forwarding, cancelled recv), 10
  rejects (E4304 x3, E3001, E2101, E7005 x2, E7004, E3101 x2, E4101)
- spec 15 §7/§9, quick reference, bundle notes, plan
2026-10-05 18:02:11 +03:00
..

Documentation

Layout

Directory Kind Purpose
spec/ Normative What a conforming implementation MUST do
rfcs/ Decision records Major design proposals and their rationale; accepted changes live in spec/
reference/ Normative registries Grammar, error codes, intrinsics, type properties, litmus tests, glossary
design/ Non-normative Short design decisions and the open-questions log
plan/ Non-normative Implementation plan, per-phase task breakdowns, conformance plan
evaluation/ Non-normative Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules
dev/ Non-normative How the reference implementation is built and tested

Precedence

The specification is the single normative source. When documents disagree (from AGENTS.md):

  1. spec/;
  2. reference/;
  3. examples;
  4. README prose.

RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.

design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.

Where to put a new document

You are writing… Put it in
a MUST/SHOULD rule the matching spec/NN-*.md
a major change to memory, concurrency, effects, AIR or unsafe rfcs/NNNN-title.md from rfcs/0000-template.md
a new error code, intrinsic or grammar rule reference/ (and src/diag.zig for codes)
a new AIR feature bundle reference/air-features.md (and src/air/features.zig)
a small decision with a one-paragraph reason design/decisions.md as the next DD-NNN
a gap or ambiguity you found but cannot resolve now design/open-questions.md as the next Q-NNN
tasks, milestones, sequencing plan/
benchmark tasks, evaluation methodology (public dev material only) evaluation/; hidden tests go to the private benchmark repository
implementation architecture, conventions, test how-to dev/

Reading order

New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.

Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.