Files
aji/docs
dev 00cbb65447 E-N0: native-agent mode (Track B) and the native dev-echo gate
ajieval native: Codex, Claude Code and OpenCode in bubblewrap with a
shared network (backend only matters), a fresh HOME holding only the
credential file and a harness-written minimal config (no user skills,
MCP, memory, agents, plugins, global instructions), /work, read-only
/docs and toolchain; evaluator and Aji repository invisible. Codex:
workspace-write sandbox (shell without network), web search and product
features off. Claude Code: tools Bash/Read/Edit/Write, strict MCP,
slash commands off. OpenCode: pure, no MCP, webfetch/websearch/task off.
Record aji-eval-native/1: CLI version, requested/transcript model,
effort, account mode, config, command line, times, transcript, usage
(normalized), patch, final repository, verdict.

Gate on dev-echo (Aji/AIR) accepted for all three: codex 0.160.0 +
gpt-6.1-sol (high), Claude Code 2.1.288 + claude-opus-5-5 (high),
OpenCode 1.18.34 + zai-coding-plan/glm-5.3-flash. Protocol §39b and
plan: Track B first (E-N0 done, E-N 18 runs), Track A after analysis.
2026-10-04 17:48:43 +03:00
..

Documentation

Layout

Directory Kind Purpose
spec/ Normative What a conforming implementation MUST do
rfcs/ Decision records Major design proposals and their rationale; accepted changes live in spec/
reference/ Normative registries Grammar, error codes, intrinsics, type properties, litmus tests, glossary
design/ Non-normative Short design decisions and the open-questions log
plan/ Non-normative Implementation plan, per-phase task breakdowns, conformance plan
evaluation/ Non-normative Empirical evaluation of the Aji hypothesis (spec 14): protocol, stages, integrity rules
dev/ Non-normative How the reference implementation is built and tested

Precedence

The specification is the single normative source. When documents disagree (from AGENTS.md):

  1. spec/;
  2. reference/;
  3. examples;
  4. README prose.

RFCs are not in this list: accepting an RFC integrates its rules into spec/ in the same change, after which the RFC is the record of why, and the spec is the record of what.

design/, plan/ and dev/ never override the above. If a plan or dev document contradicts the spec, the plan or dev document is wrong.

Where to put a new document

You are writing… Put it in
a MUST/SHOULD rule the matching spec/NN-*.md
a major change to memory, concurrency, effects, AIR or unsafe rfcs/NNNN-title.md from rfcs/0000-template.md
a new error code, intrinsic or grammar rule reference/ (and src/diag.zig for codes)
a new AIR feature bundle reference/air-features.md (and src/air/features.zig)
a small decision with a one-paragraph reason design/decisions.md as the next DD-NNN
a gap or ambiguity you found but cannot resolve now design/open-questions.md as the next Q-NNN
tasks, milestones, sequencing plan/
benchmark tasks, evaluation methodology (public dev material only) evaluation/; hidden tests go to the private benchmark repository
implementation architecture, conventions, test how-to dev/

Reading order

New to Aji: ../README.md → spec/README.md → spec 00, 01, 03, 04, 07, 08, 13.

Starting implementation work: plan/README.md → the current phase file → dev/architecture.md → dev/testing.md.