Commit Graph
4 Commits
Author SHA1 Message Date
dev ba3e9b3719 Phase 6A: .aji frontend, layer 1 (scalars, expressions, functions, control flow)
src/frontend: lexer, AST, parser for the full 6A grammar (first error
only: one E7001 with span, expected and found), lowering to canonical
text AIR with a line map. Variables become SSA with block parameters
carried across if/while/for/loop joins; short-circuit and/or; checked,
wrapping and cast forms; calls; untyped let literals typed from later
uses, never guessed (E7007). The frontend repairs nothing.

check.checkFile: .aji → frontend → existing AIR parser and verifier;
every diagnostic at its source location, AIR location kept as
air_line/air_col; trap records gain source_location. CLI: check/run on
.aji, aji lower [--annotate].

Runner: .aji tests with the same headers; every accepted module must
lower deterministically, be canonical (lower → parse → print
unchanged) and match <file>.expected if present. Layer-1 tests: 6 run,
6 E7xxx rejects, 2 verifier-caught (E1002, E3101).
2026-10-05 11:23:18 +03:00
dev bfb4c445cd plan: Phase 6A task table (P6A-1 done) 2026-10-05 10:38:15 +03:00
dev 80f5143c0e plan: Phase 6A brought forward, P4/P5 paused; M and C become dev material
Owner decision after the native smoke: a minimal .aji frontend over the
frozen Phase 0-3 semantics (removes SSA, block parameters, CFG, feature
header; keeps every semantically significant action explicit), with
quantitative targets; quick reference and generic diagnostics in
parallel; new harder held-out benchmark; four conditions Rust, Zig,
Aji/AIR, Aji/source. Protocol: seen held-out tasks become dev material.
2026-10-05 10:09:53 +03:00
dev 11ce6cb38c plan: implementation plan with per-phase task breakdowns
- plan/README.md: sequencing principles, milestones M1-M5, phase table
  with exit criteria and blocking questions, dependency graph, error-code
  -> phase coverage, cross-cutting tracks, task conventions
- phase-0..phase-8 files: scope, invariants, task tables (P<N>-<k>) with
  dependencies, outputs and mechanical "done when" checks
2026-10-04 12:05:40 +03:00