- docs/evaluation/results/2026-10-05-p6a-9.md: 12 paired cells on
p6a-candidate, criteria fixed before the runs (output-token criterion
reported as not met), owner's assessment and hypothesis statuses
- phase 6 plan: P6A-9 and P6A-10 done, exit review; plan README: P6A done,
P4/P5 unpaused, next held-out benchmark Rust/Zig/Aji-source with three
difficulty levels, Aji/AIR only as a control
- checkpoint note renamed to its actual date (2026-10-05)