dev ce9ef03bc0 spec 04 §20: Q-024 resolved (RMW events, initialization write, object orders, channel FIFO and capacity, C++20 release sequence); litmus corpus normative; P5-0 PASS; Phase 5 implementation GO 2026-10-06 07:26:47 +03:00
dev cfee89ff19 P5-0: M/C regression on p4-frozen (6/6 PASS); fix frontend defect A found by gate R3
A `ref` of a place reached through a `mut` borrow (`ref s.buf`, `ref s.n`
with `s: mut<S>`) is now a shared reborrow (borrow.ref). Before, an array
field lowered to slice_mut and reached the verifier as E1001, and a scalar
field was rejected with E7005. Regression test ref_through_mut.aji.
2026-10-06 00:35:22 +03:00
dev 0972ed2a5e P6A-9 results and Phase 6A exit review (PASS)
- docs/evaluation/results/2026-10-05-p6a-9.md: 12 paired cells on
  p6a-candidate, criteria fixed before the runs (output-token criterion
  reported as not met), owner's assessment and hypothesis statuses
- phase 6 plan: P6A-9 and P6A-10 done, exit review; plan README: P6A done,
  P4/P5 unpaused, next held-out benchmark Rust/Zig/Aji-source with three
  difficulty levels, Aji/AIR only as a control
- checkpoint note renamed to its actual date (2026-10-05)
2026-10-05 21:37:04 +03:00
dev c2c238d9b1 M checkpoints recorded; harness statuses; memory test split; P6A-12
- results note docs/evaluation/results/2026-10-06-m-checkpoints.md:
  both checkpoints, owner's assessment (IR-tax closed at the engineering
  level, layer 7 GO; cost hypothesis open); plan status and order
- P6A-12: source type-check completeness (E1001 reached the verifier
  from a source run); not a layer 7 blocker
- harness: metrics.agent_status (max_tokens for a reply cut at its
  length limit, provider_rate_limited for 429/usage limits) and
  metrics.evaluation_status (accepted/rejected/evaluator_error/
  infrastructure_failure/not_evaluated), kept apart; termination records
  max_tokens; checkpoint rows show both; evaluator contract: an
  infrastructure failure sets "infrastructure": true
- interpreter memory test: fast form (20k-320k iterations, 256 KiB
  threshold via Options.collect_threshold) in zig build test; full form
  (100k/1M/4M) in zig build test-extended; CI job 'extended' also runs
  conformance with --collect-every-step
2026-10-05 17:43:55 +03:00
dev 80f5143c0e plan: Phase 6A brought forward, P4/P5 paused; M and C become dev material
Owner decision after the native smoke: a minimal .aji frontend over the
frozen Phase 0-3 semantics (removes SSA, block parameters, CFG, feature
header; keeps every semantically significant action explicit), with
quantitative targets; quick reference and generic diagnostics in
parallel; new harder held-out benchmark; four conditions Rust, Zig,
Aji/AIR, Aji/source. Protocol: seen held-out tasks become dev material.
2026-10-05 10:09:53 +03:00
dev e83b71d82b evaluation: record the native smoke results and the §38 analysis
Tasks under aliases M and C. Strong agents at the ceiling; Aji/AIR cost
comes from a fixed bundle read (~33k tokens), ~3x source size and 4-8x
output tokens, and, for the weak agent, mostly IR-form errors (SSA, CFG)
rather than safety-rule errors; E0006 the only friction for strong
agents. Not evidence; no language change follows directly.