- program_parallel_map: four exclusive loans of disjoint quarters
- program_channel_transfer: heap-owned messages moved through a bounded
channel; the 64-byte budget fits exactly the bounded worst case
- program_tcp_echo_tasks: server task, one echo task per connection,
two client tasks sharing address and message by shared loans
- runner --stress N: seeds 0..N-1 under quanta 1, 2, 7 and the test's
own; failures print the replay command; CI runs --stress 200
- plan: P3-12, P3-13 done
- features cancellation, channels, sync supported
- AIR model/parser/printer: shield, sender<T>, receiver<T>, mutex<T>,
guard<T>; task.check_cancel, task.join.cancel, task.shield.*,
channel.*, select (bracketed arms), mutex.*
- verifier: arities (E5002), element rules (E4001/E1001, E0006
channel_transfer), guard_transfer gating, task.wait effect (gated for
task.join by cancellation), per-edge consumption with values and
handles returned as block parameters, loans moved to the handle on
task.join.cancel's cancelled edge, shield order (E4305), guard
children (E2102), critical-section rule (E4304)
- interpreter: waiting-operation rule (ready, else cancelled if
observable, else wait), shield depth, bounded and rendezvous channels
with FIFO offers, drain-then-close receiver, budget release at the
last close, select with seeded draw among ready arms, mutex wakeups;
schedule record also after a select draw
- report counts task.spawn, task.wait and channel allocations
- spec erratum: mutex<T> is linear (format 0 has no droppable
move-only class)
- 30 new conformance tests (10 run with schedules, 4 accept, 16
reject); 6000-run schedule stress and 4350 mutants without failure
- interpreter core rewritten around explicit per-task frame stacks so a
task can be suspended at any instruction; behavior of all existing
tests unchanged
- tasks: scope and task<T> (function-bound; task_transfer and
task_borrow_returns reserved), spawn/join/cancel/cancelled/scope.end;
cooperative scheduler with seeded choice rule, separate schedule seed,
quantum = fuel unit, task limit (limit_exceeded kind tasks), global
quiescence over waiting tasks; schedule field in the run record
- verifier: Send/Share table (E4001, E4002), loans as task-owned borrows
(E4302 on early end, E4101 on conflicts), E4301 at scope end, task
effects (E3101)
- CLI --quantum, --task-limit, --schedule-seed; runner schedules:,
quantum:, task_limit:, limit_exceeded:
- fixed: schedule seed default used orelse/^ precedence wrongly
- 15 phase-3 conformance tests; 4000 mutants without a crash
- Agent Reference Bundle +10.9 % tokens (recorded)