Commit Graph
3 Commits
Author SHA1 Message Date
dev 19dff5dd52 air: feature negotiation for AIR format 0 (DD-014)
- reference/air-features.md: normative feature registry (arrays,
  atomics, capabilities, channels, effects, islands, ownership, regions,
  sync, tasks; all reserved), dependency closures, reasons for E0006
- spec 07 §8.1/§8.5/§8.7: features are mandatory, validated before the
  body, full dependency closure declared, sorted canonically; every
  extension belongs to a feature; published feature semantics immutable
- spec 05 §8: features vs effects vs capabilities
- src/air/features.zig: registry, validation, sync test with the docs
- parser validates features first; E0006 carries `reason`
- `aji features` prints supported AIR format, language and features
- conformance: unknown, reserved and duplicate feature tests
- plan: feature publication tasks in phases 1-5
2026-10-04 12:49:29 +03:00
dev 03dda1245a spec: single normative source, accept RFC 0004, freeze AIR format 0, fuel
Owner decisions after the Phase 0 review:

- precedence: docs/spec/ is the single normative source; RFCs are
  decision records whose accepted rules are integrated into the spec in
  the same change (AGENTS.md, docs/README.md, rfcs/README.md, DD-011)
- RFC 0004 Accepted (scope: AIR format 0, language 0.1)
- AIR format 0 frozen as the semantic baseline; spec 07 §8.7 defines the
  only permitted additive changes, everything else needs `air 1` (DD-012)
- Q-019 resolved: deterministic instruction fuel (spec 11 §7). Outcome
  `limit_exceeded` is a runner outcome, not a trap; `aji run --fuel N`,
  exit code 5; conformance runs always use fuel (default 1 000 000,
  `fuel:` header); fuel/schedule budget/quantum kept separate for P3
  (DD-013)
2026-10-04 12:40:32 +03:00
dev 11ce6cb38c plan: implementation plan with per-phase task breakdowns
- plan/README.md: sequencing principles, milestones M1-M5, phase table
  with exit criteria and blocking questions, dependency graph, error-code
  -> phase coverage, cross-cutting tracks, task conventions
- phase-0..phase-8 files: scope, invariants, task tables (P<N>-<k>) with
  dependencies, outputs and mechanical "done when" checks
2026-10-04 12:05:40 +03:00