E-N done: native smoke recorded; ajieval profile for cost/failure analysis

18 runs, 17 accepted; frontier agents at ceiling; GLM Aji/AIR 1/2 (BUDGET).
No compression signal; Aji/AIR costs more for every agent. Plan and
protocol updated (budget-terminated runs are judged on their final
repository). ajieval profile: per-run termination, output tokens, source
size and diagnostic-code occurrences, without task content.
This commit is contained in:
dev committed 2026-10-05 07:44:35 +03:00
1 parent 2ee1ff192f
commit e959156c65
5 files changed
+70 -2

No files matched your search

+1 -1
View File
@@ -100,7 +100,7 @@ Evaluation runs alongside the phases; each stage starts when the language featur
| E-G | todo | Gate before E-N (and later E-S): private tasks reviewed; evaluator, task and evaluator hashes frozen; Rust, Zig and Aji/AIR references written by separate clean agents pass; Aji commit, bundle, toolchains and docs frozen with `ajieval freeze` (checklist in `docs/evaluation/benchmark-authoring.md`) | E0-2, E0-4 | all gates pass |
| E-S | todo | Engineering smoke test, Track A: 2 families (binary/stream parser, concurrent bounded pipeline) × 3 languages × 3 models (M1–M3) × 2 runs = 36 runs on one Aji commit (protocol §39a); plan shape `docs/evaluation/smoke-plan.example.json`; failures classified by cause after the matrix, before any language change | E-C, E-G | harness, bundle sufficiency, accounting and traces verified |
| E-N0 | done | Native dev-echo gate (Aji/AIR): Codex + `gpt-6.1-sol` (effort high), Claude Code + `claude-opus-5-5` (effort high), OpenCode + `zai-coding-plan/glm-5.3-flash` all accepted; networkless shell for all three verified by `dev-netprobe`; context metrics (provider / cumulative / unique reference) | E0-3 | `ajieval native`, `ajieval freeze`, `ajieval journal` |
| E-N | todo | Track B native smoke, first experiment (owner decision): 2 tasks × 3 languages × 3 native agents (N1–N3) × 1 run = 18 runs on subscriptions (protocol §39b); never evidence for H4; plan shape `docs/evaluation/native-smoke-plan.example.json` | E-N0, E0-2, E-G | native-agent report; failures classified before any language change |
| E-N | done | Track B native smoke (2026-10-05): 18 runs, 17 accepted; Codex and Claude Code 12/12 (ceiling), OpenCode/GLM Rust 2/2, Zig 2/2, Aji/AIR 1/2 (one BUDGET failure). No compression signal at this difficulty; Aji/AIR costs more time, tool calls and uncached input for every agent (fixed bundle reading ≈30–36k unique tokens per run; Rust runs read no docs). Infrastructure goals met. Not evidence (protocol §39a/§39b) | E-N0, E0-2, E-G | `aji-bench/owner/native-smoke/summary.md` (private); analysis per §38 pending (`ajieval profile`) |
| E-A | todo | Stage A pilot (condition `Aji/AIR`): T01–T04 families × Aji/Rust/Zig × 3 model classes × 3 runs = 108 runs (protocol §39); not headline evidence | E-S, basic Phase 3 | pilot report: effect size, broken tasks, cost, instrumentation |
| E-B | todo | Stage B: T05–T07 | Phase 3 | stage report |
| E-C | todo | Stage C: T08, litmus repair | Phase 5 | stage report |