docs: map contract source errors and compatibility rejections
This commit is contained in:
1 parent
c633f23952
commit
b3051f161c
5 files changed
+476
No files matched your search
@@ -165,6 +165,8 @@ Remaining decisions: shared observation coverage (Q-057) and invariant-evaluatio
|
||||
|
||||
## Compatibility and integration
|
||||
|
||||
The [source rejection/compatibility audit](../design/contract-source-errors-and-compatibility.md) proposes eight precise E7006 reason additions while retaining ordinary source type/name/transfer errors and mapped verifier facts. Ten executed AIR0 rejection vectors distinguish dependent undefined results, unrelated SSA defects and the separate header E0001 issue. They do not settle Q-055: a causal exception policy or AIR1 requires an owner decision. Source reasons and runtime schemas are concrete candidates; adoption and complete vertical delivery remain open.
|
||||
|
||||
An AIR0 implementation must preserve all earlier accepted behavior, canonical bytes and rejected codes (spec 07 §8.7). Isolated candidate function operations and the snapshot/post prefix currently reject only E0004; registering them may produce E0006 when their feature is undeclared, matching the named-opcode exception and §8.1. The body-use probe also reports E5001 because the unknown instruction does not define `%old`. That shape remains invalid under the candidate's snapshot restriction; the audit concerns its rejection-code transition, not acceptance of this escape. Establish whether §8.7 covers those dependent errors, and preserve independently invalid cases; precedent alone does not settle that interpretation (Q-055). Full dependency closure and syntax audits are still required. The prefix avoids the header-specific E0001 conflict without changing compatibility policy. New type/module metadata must independently satisfy compatibility or use AIR1.
|
||||
|
||||
On acceptance integrate spec 13 §1, spec 08 §8, spec 10 §6.1, spec 11 §7, spec 07/07a, spec 15, grammar, feature/error registries and the Quick Reference together. Delivery requires source/AIR positive and negative coverage, bypass attempts, generic/package/worker cases, borrow/loan/snapshot failures, deterministic profiles/schedules and independently verified audit statuses. No implementation is authorized by this Draft alone.
|
||||
|
||||
Reference in new issue
Block a user