Phase 2: audit report (P2-10)

- spec 10 §6.1: schema of the format-0 audit report (canonical JSON)
- aji report FILE: entry capabilities, per-function effect graph with
  declared/used/unused effects (fixed point over calls, unsafe stopped
  at trusted callees), intrinsics, allocations, runtime and proven
  checks, unsafe operations; capability kinds; unsafe summary
- golden unit test; runs over the whole conformance corpus without a
  crash
This commit is contained in:
dev committed 2026-10-04 15:03:44 +03:00
1 parent 36e91be84c
commit b00bac5937
7 files changed
+312 -3

No files matched your search

@@ -34,7 +34,7 @@ Out: tasks, threads, async I/O (P3); FFI to native code (P7).
| P2-7 | done | Unsafe boundary verifier (RFC 0009: assume, borrow.index.unchecked, trusted, unsafe report) | P2-3 | `src/verifier/unsafe.zig` | E6001 accept/reject |
| P2-8 | done | Runtime intrinsics in the interpreter; virtual filesystem and loopback network for the `deterministic` profile | P2-2 | `src/runtime/` | intrinsic unit tests pass under both profiles; deterministic profile output identical across runs |
| P2-9 | doing | Entry-point capability instantiation (`--grant` done; `aji.toml` `[capabilities]` pending) | P2-5 | `src/runtime/host.zig` | missing grant fails instantiation, not execution (spec 05 §6) |
| P2-10 | todo | Reports: effect graph, capability requirements, unsafe sites | P2-4, P2-5, P2-7 | `src/report/` | deterministic JSON report; snapshot test |
| P2-10 | done | Reports: effect graph, capability requirements, unsafe sites | P2-4, P2-5, P2-7 | `src/report/` | deterministic JSON report; snapshot test |
| P2-11 | done | Reference programs: hello (real `io.write` if deferred from P0), file-copy, tcp-echo (single task) | P2-8 | `tests/programs/` | all three run; cleanup on every error path verified |
| P2-8a | done | Hosted profile: real console, files and TCP; run record through `--result-file` (spec 11 §8) | P2-8 | `src/interp/host.zig` | hello, file-copy and tcp-echo run against the real OS in CI |
| P2-12 | todo | Phase exit review | all | plan status | exit criterion passes |