plan: Phase 6A brought forward, P4/P5 paused; M and C become dev material

Owner decision after the native smoke: a minimal .aji frontend over the
frozen Phase 0-3 semantics (removes SSA, block parameters, CFG, feature
header; keeps every semantically significant action explicit), with
quantitative targets; quick reference and generic diagnostics in
parallel; new harder held-out benchmark; four conditions Rust, Zig,
Aji/AIR, Aji/source. Protocol: seen held-out tasks become dev material.
This commit is contained in:
dev committed 2026-10-05 10:09:53 +03:00
1 parent 5b7ecf9ffd
commit 80f5143c0e
4 files changed
+48 -3

No files matched your search

@@ -78,6 +78,16 @@ Means per language, all agents:
- Track B "first attempt" is derived from transcripts by a heuristic. It reports `True` for a run with dozens of verifier errors, so it is unreliable until fixed (`harness`).
- Diagnostic counts are occurrences, so a diagnostic printed twice counts twice.
## Decision (owner)
The directions are 1 + 2, then 3:
1. Phase 6A, a `.aji` frontend over the frozen semantics, without semantic change.
2. An Agent Quick Reference and generic diagnostics (`E0006` canonical header).
3. A new, harder held-out benchmark.
Tasks M and C are dev material from now on. They serve as `Aji/AIR` vs `Aji/source` engineering regression, never as evidence for `.aji`.
## Not done
No language change follows from this run directly. Candidates and the next experiment are decided by the owner. Each candidate must be justified generally (spec 14 §12) and never by these tasks.