spec: agent efficiency objectives and evaluation protocol
- spec 14: Model Capability Compression, design objectives (correctness externalization, small semantic surface, explicit semantics, local reasoning, machine repairability, deterministic feedback, bounded context / Agent Reference Bundle), economic objective, design review requirement, hypotheses H1-H6, non-goals, anti-overfitting rule - docs/evaluation/protocol.md: Agent Language Evaluation Protocol 0.1 (tasks T01-T10, maintenance and seeded-bug benchmarks, metrics, statistics, stages A-E, success and falsification criteria) - docs/evaluation/README.md: integrity rules, stage readiness - RFC process: mandatory Agent complexity impact section - AGENTS.md: overarching objective and anti-overfitting rule - plan: evaluation track E0-1..E-1; P8-7 integrates ajid with the scaffold; conformance plan points to the protocol
This commit is contained in:
1 parent
778d563182
commit
72192c2331
12 files changed
+2097
-22
No files matched your search
@@ -18,6 +18,6 @@ Non-normative. Part of the [implementation plan](README.md).
|
||||
| P8-4 | todo | `explain` and repair-candidate coverage for every registry code | P8-2 | `src/diag.zig`, spec 10 | every code has structured fields and at least one repair candidate kind |
|
||||
| P8-5 | todo | Verification report artifact (spec 10 §6) combining all `src/report/` outputs | P8-2 | `aji report` | single deterministic JSON document; schema documented |
|
||||
| P8-6 | todo | Packages: dependencies, lockfile, content addressing, sandboxed declared build extensions | — | spec 12, `src/pkg/` | dependency resolution is deterministic; unsafe dependencies reported separately |
|
||||
| P8-7 | todo | Benchmark harness: Aji vs Zig, Rust, C on shared task specs | P8-2 | `bench/` | records P(correct \| one iteration), iterations, tokens, defects |
|
||||
| P8-7 | todo | Integrate `ajid` with the evaluation scaffold (E0-3) so Aji runs use the agent protocol | P8-2, E0-3 | scaffold adapter | scaffold drives Aji through `ajid`; protocol §28 records complete |
|
||||
| P8-8 | todo | External agent trial on a reference task | P8-2…P8-5 | trial report in `docs/plan/` | exit criterion passes |
|
||||
| P8-9 | todo | Phase exit review; Aji 0.1 release-candidate checklist | all | plan status | all phases done; spec status updated |
|
||||
Reference in new issue
Block a user