P4-11: air-text.ebnf covers the syntax of Phases 2–4
Types cap<K>, resources, own/region, scope/task/shield, endpoints, mutex/guard, island/frozen/iref/arc and the built-in enums; productions for capability, heap, region, task, cancellation, channel, sync and graph instructions, with the named-edge terminator forms. Every opcode in the conformance corpus and in the spec contract tables has a production. AIR bundle +3.6 % (cl100k), recorded.
This commit is contained in:
1 parent
c699529fec
commit
3c5c129078
4 files changed
+122
-5
No files matched your search
@@ -35,7 +35,7 @@ Non-normative. Part of the [implementation plan](README.md).
|
||||
| P4-7 | done | `.aji` layer 9: types, operations, `island.at`/`frozen.at`/`arc.at` places, explicit container borrows; Quick Reference section; source coverage rows | P4-3 | `src/frontend/`, `docs/agent/` | `.aji` run/reject tests; Quick Reference examples checked; `tools/source_coverage.py` passes |
|
||||
| P4-8 | done | Reference program `island-pipeline` in AIR and `.aji` with equivalence | P4-4, P4-5, P4-6, P4-7 | `tests/conformance/` | passes under all P3 stress modes |
|
||||
| P4-9 | done | Complexity budget: AIR bundle, Quick Reference, Source Reference Bundle measured against the RFC estimate | P4-7 | `docs/agent/README.md` | growth recorded and justified |
|
||||
| P4-11 | todo | `reference/air-text.ebnf` covers the syntax of Phases 2–4: `cap<K>`, endpoint, task, graph and built-in types; `own.*`, `task.*`, `channel.*` (with the type operand of `channel.make`), `island.*`/`frozen.*`/`arc.*`/`iref.eq`; the multi-edge terminator forms (found by the independent author of `program_island_pipeline.air`) | — | `docs/reference/air-text.ebnf` | every instruction of spec 07a and spec 03 §22–§24 has a production |
|
||||
| P4-11 | done | `reference/air-text.ebnf` covers the syntax of Phases 2–4: `cap<K>`, endpoint, task, graph and built-in types; `own.*`, `task.*`, `channel.*` (with the type operand of `channel.make`), `island.*`/`frozen.*`/`arc.*`/`iref.eq`; the multi-edge terminator forms (found by the independent author of `program_island_pipeline.air`) | — | `docs/reference/air-text.ebnf` | every instruction of spec 07a and spec 03 §22–§24 has a production |
|
||||
| P4-10 | todo | Phase exit review | all | plan status | exit criterion passes |
|
||||
|
||||
## Conformance tests to add
|
||||
|
||||
Reference in new issue
Block a user