air: feature negotiation for AIR format 0 (DD-014)

- reference/air-features.md: normative feature registry (arrays,
  atomics, capabilities, channels, effects, islands, ownership, regions,
  sync, tasks; all reserved), dependency closures, reasons for E0006
- spec 07 §8.1/§8.5/§8.7: features are mandatory, validated before the
  body, full dependency closure declared, sorted canonically; every
  extension belongs to a feature; published feature semantics immutable
- spec 05 §8: features vs effects vs capabilities
- src/air/features.zig: registry, validation, sync test with the docs
- parser validates features first; E0006 carries `reason`
- `aji features` prints supported AIR format, language and features
- conformance: unknown, reserved and duplicate feature tests
- plan: feature publication tasks in phases 1-5
This commit is contained in:
dev committed 2026-10-04 12:49:29 +03:00
1 parent 03dda1245a
commit 19dff5dd52
24 files changed
+366 -17

No files matched your search

+2 -2
View File
@@ -68,7 +68,7 @@ The specification is the single normative source. When documents disagree, use t
RFCs are architectural decision records with rationale, not a normative layer. Accepting an RFC means its rule changes are integrated into `docs/spec/` (and `docs/reference/`) in the same change; from then on the spec, not the RFC, is authoritative. If an accepted RFC and the spec disagree, the spec wins and the RFC is out of date.
AIR format 0 is a frozen semantic baseline (spec 07 §8.7): do not change the meaning of existing format-0 constructs; extend only as §8.7 allows, otherwise introduce a new format version through an RFC.
AIR format 0 is a frozen semantic baseline (spec 07 §8.7): do not change the meaning of existing format-0 constructs; extend only as §8.7 allows, otherwise introduce a new format version through an RFC. Every extension belongs to a registered feature (`docs/reference/air-features.md`); modules declare features and their full dependency closure in the `features [...]` header. Keep three concepts apart: features (what the implementation must understand), effects (what code does), capabilities (what code may do).
## Normative language
@@ -131,7 +131,7 @@ zig fmt --check build.zig build.zig.zon src tools
Toolchain: Zig 0.17.0. Workflow, layout and definition of done: `CONTRIBUTING.md`. Implementation plan and current phase: `docs/plan/README.md`. Documentation layout and where new documents go: `docs/README.md`. Unresolved spec gaps: `docs/design/open-questions.md` — log new ones there instead of guessing.
`aji` CLI output contract: diagnostics are JSON Lines on stdout, human notes on stderr; exit codes 0 accepted/returned, 1 rejected, 2 usage/I/O error, 3 not yet implemented, 4 trapped, 5 execution limit exceeded. `aji run [--fuel N]` prints one JSON run record. Never use wall-clock timeouts to end runs or tests; use fuel (spec 11 §7).
`aji` CLI output contract: diagnostics are JSON Lines on stdout, human notes on stderr; exit codes 0 accepted/returned, 1 rejected, 2 usage/I/O error, 3 not yet implemented, 4 trapped, 5 execution limit exceeded. `aji run [--fuel N]` prints one JSON run record. `aji features` reports the supported AIR format, language version and features; query it before generating AIR. Never use wall-clock timeouts to end runs or tests; use fuel (spec 11 §7).
## Testing policy