plan: implementation plan with per-phase task breakdowns

- plan/README.md: sequencing principles, milestones M1-M5, phase table
  with exit criteria and blocking questions, dependency graph, error-code
  -> phase coverage, cross-cutting tracks, task conventions
- phase-0..phase-8 files: scope, invariants, task tables (P<N>-<k>) with
  dependencies, outputs and mechanical "done when" checks
This commit is contained in:
dev committed 2026-10-04 12:05:40 +03:00
1 parent 4e4d753090
commit 11ce6cb38c
11 files changed
+377 -117

No files matched your search

+36
View File
@@ -0,0 +1,36 @@
# Phase 4 — Islands
Non-normative. Part of the [implementation plan](README.md).
**Goal:** uniquely owned closed mutable graphs that move between tasks in O(1), and irreversible freezing into shareable immutable graphs.
**Exit criterion:** a cyclic graph moves between tasks with no deep copy and no shared mutation (`island-pipeline` reference program).
**Spec inputs:** spec 03 §12–15, 04 §13; RFC 0001 island sections move to Accepted.
**Blocking questions:** none recorded; log new ones before starting.
## Invariants
- `iref<T>` points only inside its own island and is never dereferenced without access to the owning island;
- an island has no edges into foreign mutable memory;
- after transfer the sender holds nothing that reaches the island;
- a `Frozen<T>` never yields a mutable reference in safe code;
- reference counts change only through explicit `arc.clone` / `arc.release`.
## Tasks
| ID | Status | Task | Depends | Output | Done when |
|---|---|---|---|---|---|
| P4-1 | todo | Contract tables: `island.create`, `island.alloc`, `island.freeze`, `iref` access, `arc.clone`, `arc.release` | — | spec 07 appendix | all spec 07 §4 fields present |
| P4-2 | todo | Island allocator in the interpreter (private regions, O(1) transfer) | P4-1 | `src/interp/memory.zig` | transfer cost independent of graph size (unit benchmark with fixed bound) |
| P4-3 | todo | `iref` verifier and closure checks | P4-1 | `src/verifier/island.zig` | E2110, E2111 accept/reject |
| P4-4 | todo | Island transfer through channels and task spawn; sender invalidation | P4-3 | verifier + interpreter | sender use after send rejected (E2001) |
| P4-5 | todo | Freeze and `Frozen<T>`; Share/Send derivation | P4-3 | verifier + interpreter | concurrent reads of frozen graph accepted; mutable access rejected |
| P4-6 | todo | `Arc<T>` for `Share` values | P4-5 | verifier + interpreter | `Arc` of non-`Share` rejected (E4002); count changes visible in trace |
| P4-7 | todo | Reference program: island-pipeline | P4-4, P4-5 | `tests/programs/island-pipeline/` | passes under all P3 stress modes |
| P4-8 | todo | Phase exit review | all | plan status, RFC 0001 | exit criterion passes; RFC 0001 fully Accepted |
## Conformance tests to add
Negative corpus entry owned by this phase: island internal reference escape. Plus E2111, freeze-then-mutate, `Arc` of non-`Share`.